Analyzing the Receiving Operation of Different Grain Types in a Single–pit Country Elevator

نویسندگان

  • R. Berruto
  • D. E. Maier
چکیده

With the rise of value–added grains and oilseeds, many elevators need to segregate their incoming products into batches of different end–use quality (for example, high oil corn, genetically modified soybeans, high protein wheat), but often they are not designed to handle this task efficiently. The primary challenge is to segregate multiple grain streams during the receiving operation without increasing waiting times for all customers. This study utilized a system simulation model to investigate how queue management could help to improve the performance of a country elevator receiving multiple grain streams with a single unloading pit. In order to maintain the speed of the unloading operation, two queuing methods were investigated: the segregated BATCH versus the traditional FIFO (first–in, first–out) queue service method. A discrete event system simulation model was developed and validated utilizing data collected at a country elevator facility in Indiana. The simulation results showed that the BATCH queue management strategy reduced average waiting times per customer by up to 27% compared to the traditional FIFO queue management strategy when the daily grain receipt was near the maximum receiving capacity of the facility. For receiving rates below 72% capacity, the traditional FIFO service had shorter average waiting times per customer.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

UPL determination of multi-element deposits with grade uncertainty using a new block economic value calculation approach

The block economic value (BEV) of a single-metal deposit is calculated based on the metal content and the related costs. The common methods available for calculating BEV are just based upon the profitable elements, and the effects of undesirable elements on BEV are not considered. However, in multi-element deposits, the effects of other elements existing in the blocks on BEV should be considere...

متن کامل

Trend of Elevator-Related Accidents in Tehran

Background:   Elevator-related accidents are uncommon, but can cause significant injury. However, little data exist on these types of accidents. To compile and analyze accident data involving elevators in an effort to eliminate or at least significantly reduce such accidents. Methods: In this retrospective study we investigated 1,819 cases of elevator-related accidents during a four-year period...

متن کامل

A quantitative model for evaluation and classification of blastings in open-pit mines

By evaluation of the blasting results, a proper blast pattern can be presented. It is, therefore, essential to employ a reliable method to evaluate blastings for the effective control and optimization of the main cycle operations. This paper aims to propose a criterion for evaluating the blasting results such as the fragmentation, muckpile condition, back-break, and fly rock, and to make a poss...

متن کامل

The effect of price changes on optimum cut-off grade of different open-pit mines

Maximizing economic earnings is the most common goal in cut-off grade optimization of open-pit mining operations. When this is the case, the price of the product has a critical effect on optimum value of cut-off grade. This paper investigates the relationship between optimum cut-off grade and price to maximize total cash flow and net percent value (NPV) of operation. In order to visualize this ...

متن کامل

Identification and Evaluation of Human Errors in Locomotive Maneuvers Using the SHERPA Technique: A Case Study in a Rail Operation Repair and Development Project

Background and Aims: despite complex technologies in many work environments, human errors are of great importance due to leading to severe and catastrophic accidents. Therefore, in order to prevent and limit the consequences of human error, it seems necessary to identify and find the causes of them. The aim of this study was to identify and evaluate the human errors of locomotive maneuvers in t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001