A two-stage stochastic programming project scheduling approach to production planning

نویسندگان

  • Arianna Alfieri
  • Tullio Tolio
  • Marcello Urgo
چکیده

In engineering-to-order (ETO) or manufacturing-to-order (MTO) systems producing highly customized items, the high level of customization, together with long flow times, forces the production plan to be defined before information on items customization, and details on the manufacturing activities are completely disclosed. Due to the partial available information, the production plan must provide a robust schedule of the activities and of the resources utilization, trying to incorporate a certain degree of anticipation of uncertainty. This paper proposes a two-stage stochastic programming project scheduling approach to support production planning in ETO/MTO system. The approach provides a baseline production plan together with a set of revisions of the plan to react to the occurrence of uncertain events. A scenario-based approach is used to model the changes affecting the characteristics of the activities to be processed. The proposed approach is tested on random-generated instances and on a real manufacturing system producing machining centers. A. Alfieri Production Systems and Economics Department, Politecnico di Torino, Turin, Italy T. Tolio ITIA-CNR, Institute of Industrial Technologies and Automation, National Research Council, Milan, Italy M. Urgo (B) Manufacturing and Production Systems Division, Mechanical Engineering Department, Politecnico di Milano, Milan, Italy e-mail: [email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

A stochastic model for project selection and scheduling problem

Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...

متن کامل

Reconfiguration of Supply Chain: A Two Stage Stochastic Programming

In this paper, we propose an extended relocation model for warehouses configuration in a supply chain network, in which uncertainty is associated to operational costs, production capacity and demands whereas, existing researches in this area are often restricted to deterministic environments. In real cases, we usually deal with stochastic parameters and this point justifies why the relocation m...

متن کامل

A multi-stage stochastic programming for condition-based maintenance with proportional hazards model

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012