Stochastic multi-site capacity planning of TFT-LCD manufacturing using expected shadow-price based decomposition
نویسندگان
چکیده
This paper presents a stochastic optimization model and efficient decomposition algorithm for multi-site capacity planning under the uncertainty of the TFT-LCD industry. The objective of the stochastic capacity planning is to determine a robust capacity allocation and expansion policy hedged against demand uncertainties because the demand forecasts faced by TFT-LCD manufacturers are usually inaccurate and vary rapidly over time. A two-stage scenario-based stochastic mixed integer programming model that extends the deterministic multi-site capacity planning model proposed by Chen et al. (2010) [1] is developed to discuss the multi-site capacity planning problem in the face of uncertain demands. In addition a three-step methodology is proposed to generate discrete demand scenarios within the stochastic optimization model by approximating the stochastic continuous demand process fitted from the historical data. An expected shadow-price based decomposition, a novel algorithm for the stage decomposition approach, is developed to obtain a near-optimal solution efficiently through iterative procedures and parallel computing. Preliminary computational study shows that the proposed decomposition algorithm successfully addresses the large-scale stochastic capacity planning model in terms of solution quality and computation time. The proposed algorithm also outperforms the plain use of the CPLEX MIP solver as the problem size becomes larger and the number of demand scenarios increases. 2012 Elsevier Inc. All rights reserved.
منابع مشابه
A stochastic dynamic programming approach for multi-site capacity planning in TFT-LCD manufacturing under demand uncertainty
The study focuses on the dynamic multi-site capacity planning problem in the thin film transistor liquid crystal display (TFT-LCD) industry under stochastic demand. Capacity planning refers to the process of simultaneously implementing a robust capacity allocation plan and capacity expansion policy across multiple sites against stochastic demand. In addition, the demand situation in TFT-LCD man...
متن کاملA Hierarchy Planning Model forTFT-LCD Production Chain
Due to the progress of high technology, TFT-LCD (Thin Film Transistor – Liquid Crystal Display) has been widely put in use recently. The manufacturing technology of the TFT-LCD industry mainly consists of array, cell, module processes, in which there exists special characteristics such as different objectives of individual process’s scheduling, complexity of manufacturing processes, and multi-s...
متن کاملA Multi-site PlanningApproach for theTFT-LCD Production Chain 193
Due to the increase of a variety of demands from downstream customers, the enterprises are necessary to expand more capacity of their factories by way of adding more plants or outsourcing. Many enterprises encounter great difficulties in production planning because manufacturing environments have changed from traditional single-plant to current multi-plants. Therefore, the company may possess m...
متن کاملAn Analytical Framework for Multi-Site Supply Chain Planning Problems
As the gradual increase of the enterprise scale, the firms may possess many manufacturing plants located in different places geographically. This change will result in the multi-site production planning problems under the environment of multiple plants or production resources. Our research proposes the structural framework to analyze the multi-site planning problems. The analytical framework is...
متن کاملA mixed 0-1 integer programming for inventory model: A case study of TFT-LCD manufacturing company in Taiwan
Purpose – This paper seeks to construct a model for inventory management for multiple periods. The model considers not only the usual parameters, but also price quantity discount, storage and batch size constraints. Design/methodology/approach – Mixed 0-1 integer programming is applied to solve the multi-period inventory problem and to determine an appropriate inventory level for each period. T...
متن کامل