Underestimating Costs in Public Works Projects
نویسنده
چکیده
Comparative studies of actual and estimated costs in transportation infrastructure development are few. Where such studies exist, they are typically single-case studies or they cover a sample of projects too small to allow systematic, statistical analyses (Bruzelius et al., 1998; Fouracre et al., 1990; Hall, 1980; Nijkamp & Ubbels, 1999; Pickrell, 1990; Skamris & Flyvbjerg, 1997; Szyliowicz & Goetz, 1995; Walmsley & Pickett, 1992). To our knowledge, only one study exists that, with a sample of 66 transportation projects, approaches a large-sample study and takes a first step toward valid statistical analysis (Merewitz, 1973a, 1973b).1 Despite their many merits in other respects, these studies have not produced statistically valid answers regarding the question of whether one can trust the cost estimates used by decision makers and investors in deciding whether or not to build new transportation infrastructure. Because of the small and uneven samples used in existing studies, different studies even point in opposite directions, and researchers consequently disagree regarding the credibility of cost estimates. Pickrell (1990), for instance, concludes that cost estimates are highly inaccurate, with actual costs being typically much higher than estimated costs, while Nijkamp and Ubbels (1999) claim that cost estimates are rather correct. Below we will see who is right. The objective of the study reported here was to answer the following questions in a statistically valid manner: How common and how large are differences between actual and estimated costs in transportation infrastructure projects? Are the differences significant? Are they simply random errors? Or is there a statistical pattern to the differences that suggests other explanations? What are the implications for policy and decision making regarding transportation infrastructure development?
منابع مشابه
Lifting the veil.
J.J. Reilly documented in 2001 that a significant number of complex infrastructure projects substantially exceeded their budgets. He presented his findings at the March 2001 American Underground Construction Conference. Fryvbjerg published his results in “Underestimating Costs in Public Works, Error or Lie?” in the summer 2002 American Planning Association Journal. Flyvbjerg reported on the cos...
متن کاملThe standard procurement approach: first price or second price auctions
Auctions are supposed to procure the best deal money can buy. Yet, practitioners who procure complex contracts by auction are well aware of some basic pitfalls. One concern is that winning bids may not reflect the quality of the bidder but strategic behavior like low-balling bids or underestimating costs. Such behavior may then lead to demands for contract renegotiation by the winning bidder th...
متن کاملA Two-Factor Uncertainty Model to Determine the Optimal Contractual Penalty for a Build-Own-Transfer Project
Public-Private Partnerships (PPP) became one of the most common types of public procurement arrangements and Build-Own-Transfer (BOT) projects, awarded through adequate bidding competitions, have been increasingly promoted by governments. The theoretical model herein proposed is based on a contractual framework where the government grants leeway to the private entity regarding the timing for pr...
متن کاملA MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...
متن کاملA New Approach to Project Risk Responses Selection with Inter-dependent Risks
Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and dependent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. Th...
متن کامل