Re{entrant lines are manufacturing systems where parts may return more than once to the same machine, for repeated stages of processing. Examples of such systems are semiconductor manufacturing plants. We consider the problems of scheduling such systems to reduce manufacturing lead times, variations in the manufacturing lead times, or holding costs. We assume a deterministic model, which allows for bursty arrivals. We show how one may design scheduling policies to help in meeting these objectives. To reduce the mean or variance of manufacturing lead time, we design a class of scheduling policies called Fluctuation Smoothing policies. To reduce the holding costs in systems with set{up times, we introduce the class of Clear{A{Fraction scheduling policies. We study the stability and performance of these scheduling policies. We illustrate how scheduling policies can be unstable in that the levels of the bu ers become unbounded. However, we show that all Least Slack policies, including the well known Earliest Due Date policy and all the Fluctuation Smoothing policies, are stable. 1.
منابع مشابه
A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملRe-entrant Manufacturing Systems
Re-entrant manufacturing systems differ from traditional manufacturing systems in the sense that a job may visit a service station more than once, at various stages of the product development cycle. Several parts at different stages of processing may be in contention for service at the same machine, which gives rise to the need to solve scheduling problems. This document surveys some of the fac...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملModeling the Effect of Hot Lots in Semiconductor Manufacturing Systems [Correspondence] - Semiconductor Manufacturing, IEEE Transactions on
The presence of hot lots or high-priority jobs in semiconductor manufacturing systems is known to significantly affect the cycle time and throughput of the regular lots since the hot lots get priority at all stages of processing. In this paper, we present an efficient analytical model based on re-entrant lines and use an efficient, approximate analysis methodology for this model in order to pre...
متن کامل