Custom Scheduling Algorithms in Real-world Applications
نویسندگان
چکیده
The paper describes the possibility of using of the Preactor Express software as a visualisation and manipulation platform for custom scheduling algorithms. The implementation of a custom scheduling algorithm for a real-world application is often far less time consuming than developing a practical and comfortable user interface for the application. It is the reason why many of scheduling algorithms remain only academic ideas. Preactor Express provides many ways of accessing scheduling data, e.g.: an interactive Gantt chart, resource calendars, a report generator. Preactor Express is free of charge software. Rules of connecting external algorithms to the Preactor Express are presented and a simple example of the connection with a custom algorithm is given in the paper. The purpose of the solution is to provide a bridge between custom innovative scheduling algorithms and a professional graphical user interface characteristic of real-world applications. It can be valuable for prototype projects for industry as well as for researchers that develop scheduling algorithms. Paper type: Viewpoint Vol. 2, No. 3, pp. 233-245 Published online: 30 July 2012 ISSN 2083-4942 (Print) ISSN 2083-4950 (Online) © 2012 Poznan University of Technology. All rights reserved.
منابع مشابه
An Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملAn Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملIntegrated capacitated transportation and production scheduling problem in a fuzzy environment
Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited. In addition, the recent decade has seen the rapid development of controlling the uncertainty in the production scheduling configurations along with proposing novel solution approaches. This paper proposes a new mathematical model...
متن کاملMULTI-OBJECTIVE ROUTING AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEMS UNDER UNCERTAINTY
The efficiency of transportation system management plays an important role in the planning and operation efficiency of flexible manufacturing systems. Automated Guided Vehicles (AGV) are part of diversified and advanced techniques in the field of material transportation which have many applications today and act as an intermediary between operating and storage equipment and are routed and contr...
متن کامل