Dynamic Quality and Change Management For Large Scale Concurrent Design and Construction Projects

نویسنده

  • Sang Hyun Lee
چکیده

Though concurrent design and construction has been lauded for reducing the time of the total processes, such an approach may make projects more uncertain and complex than those where a sequential design and construction process is used. The main sources of risk are iterative cycles that result from errors and changes introduced during the execution of concurrent design and construction. Such cycles create subsequent impacts on the project performance. In addition, traditional network scheduling tools are not adequate to deal with problems encountered during concurrent design and construction because they consider the project only as a combination of discrete activities and ignore dynamic interactions between different activities. In this context, Dynamic Planning and control Methodology (DPM), a simulation-based planning and control tool, was developed to help prepare a robust construction plan that would avoid these uncertainties. However, DPM focuses only on iterative cycles caused by quality problems in construction, and it lacks the capability to deal with change cycles. In order to address this issue, this paper proposes a framework for quality and change management and a new generation of DPM based on this framework. The new DPM incorporates the traditional network tools and buffering strategies into system dynamics simulation models and aims to capture iterative cycles and their impact on design and construction performance in advance. Generated policy guidelines and analysis by the new DPM show comprehensive project profiles and help avoid unnecessary redundant subsequent actions. In addition, uncertainties of complex concurrent projects can be reduced by the buffering strategy of the new DPM. Finally, a case study of a bridge project demonstrates that DPM can help prepare robust and systemic planning for concurrent design and construction in the real world setting, and DPM allows managers or site engineers to analyze the unpredictable incidents that may occur during concurrent design and construction and to anticipate their impacts on project performance. Thesis Supervisor: Feniosky Pefia-Mora Title: Associate Professor of Civil and Environmental Engineering

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

Change Management and Change Process Model for the Iranian Construction Industry

Changes are inevitable in construction projects. They could lead to disruptive impacts on the quality, schedule and budget of projects. Identifying changes and anticipating their consequences can help project teams mitigate these negative impacts. As a result, a change process model has been defined to improve this procedure. At first the present paper the defines some of the key terms in this ...

متن کامل

Constructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis

Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

The Role of RFID to Improve Materials Flow in Mega-projects Site

In according to quantity of various consumption materials in construction sites of complex projects such as oil industry, infrastructure, and large scale commercial, management and monitoring of materials can affect on the final time and cost of project’s activities. In today’s world of rising labor costs and labor shortages, automated materials tracking can provide some advantage to impr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014