Spare parts stock control for redundant systems using reliability centered maintenance data
نویسندگان
چکیده
In the classical approach to determine how many spare parts to stock, the spare parts shortage costs or the minimum fill rate is a key factor. A difficulty with this approach lies in the estimation of these shortage costs or the determination of appropriate minimum fill rates. In an attempt to overcome this problem, we propose to use the data gathered in reliability centered maintenance (RCM) studies to determine shortage costs. We discuss the benefits of this approach. At the same time, the approach gives rise to complications, as the RCM study determines downtime costs of the underlying equipment, which have a complex relation with the shortage cost for spare parts in case multiple pieces of equipment have different downtime costs. A further complication is redundancy in the equipment. We develop a framework that enables the modeling of these more complicated systems. Based on the framework, we propose an approximative, analytic method that can be used to determine minimum stock quantities in case of redundancy and multiple systems. In a quantitative study we show that the method performs well. Moreover, we show that including redundancy information in the stocking decision gives significant cost benefits. & 2011 Elsevier Ltd. All rights reserved.
منابع مشابه
Integrating reliability centered maintenance and spare parts stock control
In the classical approach to determine how many spare parts to stock, the spare parts shortage costs or the minimum fill rate are a key factor. A difficulty with this approach lies in the estimation of these shortage costs or the determination of appropriate minimum fill rates. In an attempt to overcome this problem, we propose to use the data gathered in reliability centered maintenance studie...
متن کاملReliability or Inventory? Contracting Strategies for After-Sales Product Support
Traditional sourcing arrangements for after-sales support of capital-intensive products such as airplanes, weapons systems, and manufacturing equipment have centered around physical assets. Typically, customers would pay the supplier of maintenance and repair services (usually the product manufacturer) for the resources, such as spare parts, that were needed to maintain the products. In recent ...
متن کاملA Systematic Approach to Internal Spare Parts Management by Paul
Internal spare parts management is a universal issue faced by all manufacturers, and involves decision-making and planning across a highly complex and heterogeneous group of thousands of items. Spare parts exhibit intermittent demand and a variety of prices, lead times, and potential downtime costs that pose challenges for planning and control. Managers can facilitate spare parts decision-makin...
متن کاملTire demand planning based on reliability and operating environment
Tires represent a critical spare part in mines. There is a shortage of medium and large tires. In addition, with increased mining activities and the creation of new mines, the demand for tires has increased significantly. Thus, it is particularly important for mining engineers to identify tire characteristics and correctly manage the spare part inventory. Spare parts management is critical from...
متن کاملOptimization models for critical spare parts inventories - a reliability approach
In industries characterized by heavy utilization of equipment and machinery, such as mining, oil & gas, utilities, transportation, adequate stockholding of critical spare parts becomes essential. Insufficient stocks affect overall performance of physical assets, as lack of spares may result in gross penalties, lower availability or increased operational risks. On the other hand, oversized inven...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
- Rel. Eng. & Sys. Safety
دوره 96 شماره
صفحات -
تاریخ انتشار 2011