This study investigates the statistical relationship between actual and estimated cost of road construction activities. It is based on a sample of 100 road construction projects awarded in the West Bank in Palestine over the years 2004 2008. Based on this data, regression models were developed. The investigated construction activities in this study are earthworks, base works, asphalt works and furniture works. The findings reveal that the average cost deviation in the investigated activities is as follows: earthworks= -15.7%, base works = 12.9%, asphalt works = 18.5% and furniture works = 36.4%. The relationship between cost divergence of each investigated activity and physical project characteristics (i.e. project size, terrain condition, ground condition and soil quality) is discussed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

Prediction of The Pavement Condition For Urban Roadway A Tehran Case Study (RESEARCH NOTE)

This report is the result of a research project on a pavement management system that was preformed by the Transportation Division of Iran University of Science and Technology. Information used in the project was collected from 20 zones of the Tehran Municipality. Any maintenance and repair system for roads is normally compared of a number of general and coordinated activities in conjunction wit...

متن کامل

Feasibility study and location of villages prone to construction of international eco-camp: A case study of Kermanshah province

The use and commercialization of natural heritage and turning it into a tourism product has become an ideal strategy for sustainable development in potential but neglected areas. Eco-camps are low-cost accommodations with minimal environmental damage that can satisfy nature-loving tourists from all over the world during their stay. The purpose of this study is to evaluate the feasibility and lo...

متن کامل

ROAD DATA INFORMATION SYSTEM; BUDAPEST CASE STUDY

Budapest Közút is developing ROad Data Information System based on mobile laser scanning since 2013. All public roads (cca. 5000 km) are surveyed by MLS (Riegl VMX450) in survey grade accuracy and all visible road assets has been digitized and loaded to a complex 3D GIS environment. Since the first full coverage had been done in 2014 the whole city has also been updated - being one of the few l...

متن کامل

Developing an Integrated Simulation Model of Bayesian-networks to Estimate the Completion Cost of a Project under Risk: Case Study on Phase 13 of South Pars Gas Field Development Projects

Objective: The aim of this paper is to propose a new approach to assess the aggregated impact of risks on the completion cost of a construction project. Such an aggregated impact includes the main impacts of risks as well as the impacts of interactions caused by dependencies among them. Methods: In this study, Monte Carlo simulation and Bayesian Networks methods are combined to present a frame...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011