Choosing a project risk-handling strategy: An analytical model
نویسندگان
چکیده
Project risk management includes the process of risk identification, analysis, and handling (response). Risk handling/ response is the choice of a proper strategy to reduce the likelihood of the occurrence of risk events and/or the magnitude of their negative impact. Research on risk handling is mostly opinionor case-based and, as such, it offers scant guidelines for making the decision. Managers often choose a risk-handling strategy based on their experience or preference toward risk, with no consideration of project characteristics (e.g., project size, slack, or technical complexity) and the associated financial implications. This study assumes that the choice of the risk-handling strategy should be aligned with unique project characteristics. This study constructed a conceptual framework that defines the relationship between risk-handling strategy and relevant project characteristics. A conceptual model was developed to describe the quantitative relationships among all variables. Accordingly, optimization analysis is performed to derive a minimum-cost risk-handling strategy for a particular risk event. The findings provide insights into how various project characteristics and risk situation affect the choice of a risk-handling strategy. r 2007 Elsevier B.V. All rights reserved.
منابع مشابه
Using fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملA Model for Prioritizing the Risks Associated with Road Construction Projects Based on Generalized Secondary Goal
This paper aims at providing a new model based on Data Envelopment Analysis (DEA) to prioritize project risks. It is clear that the large amounts of involved capitals, the long term of infrastructure projects’ implementation, and the project management problems in on-time completion of projects indicate the necessity of paying particular attention to this issue and conducting applied researc...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملProposing the simplified model for choosing the method of retrofitting in existing structures against fire risk
Background and objective: According to the necessities in the part 3 of National Building Regulations, design and construction of buildings should be in a way that the structures, according to the type of use, the size and the number of floors, resist long enough to fire, and prevent from destruction of buildings or from spread of fire to adjacent spaces or buildings. For this purpose, it is ne...
متن کامل