Parallel Machine Scheduling with Uncertain Communication Delays

نویسندگان

  • Aziz Moukrim
  • Eric Sanlaville
  • Frédéric Guinand
چکیده

This paper is concerned with scheduling when the data are not fully known before the execution. In that case computing a complete schedule off-line with estimated data may lead to poor performances. Some flexibility must be added to the scheduling process. We propose to start from a partial schedule and to postpone the complete scheduling until execution, thus introducing what we call a stabilization scheme. This is applied to the m machine problem with communication delays: in our model an estimation of the delay is known at compile time; but disturbances due to network contention, link failures, ... may occur at execution time. Hence the processor assignment and a partial sequencing on each processor are determined off-line. Some theoretical results for tree-like precedence constraints and an experimental study show the interest of this approach compared with fully on-line scheduling.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

متن کامل

Delay-Scheduled Controllers for Inter-Area Oscillations Considering Time Delays

Unlike the existing views that was introduced the existence of delay caused by the transmission of wide area measurement system data (WAMS) into the controllers input of the power oscilation damping (POD) by communication networks as a reason for poor performance of the POD controllers. This paper shows that the presence of time delay in the feedback loop may improve the performance of a POD co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • RAIRO - Operations Research

دوره 37  شماره 

صفحات  -

تاریخ انتشار 2003