A new scenario generation-based method to solve the unit commitment problem with high penetration of renewable energies

نویسندگان

  • G. J. Osório
  • J. M. Lujano-Rojas
  • J.C.O. Matias
  • J.P.S. Catalão
چکیده

Optimal operation of power systems with high integration of renewable power sources has become difficult as a consequence of the random nature of some sources like wind energy and photovoltaic energy. Nowadays this problem is solved using the Monte Carlo Simulation (MCS) approach, which allows the consideration of important statistical characteristics of wind and solar power production, such as the correlation between consecutive observations, the diurnal profile of the forecasted power production, and the forecasting error. In this paper, a new model of the unit scheduling of power systems with significant renewable power generation based on the Scenario Generation/Reduction method combined with the Priority List (PL) method is proposed that finds the probability distribution function (PDF) of a determined generator be committed or not. This approach allows the recognition of the role of each generation unit on the day-ahead unit commitment (UC) problem with a probabilistic point of view, which is important for acquiring a cost-effective and reliable solution. The capabilities and performance of the proposed approach are illustrated through the analysis of a study case, where the spinning reserve requirements are probabilistically verified with success. © 2014 Elsevier Ltd. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Unit commitment by a fast and new analytical non-iterative method using IPPD table and “λ-logic” algorithm

Many different methods have been presented to solve unit commitment (UC) problem in literature with different advantages and disadvantages. The need for multiple runs, huge computational burden and time, and poor convergence are some of the disadvantages, where are especially considerable in large scale systems. In this paper, a new analytical and non-iterative method is presented to solve UC p...

متن کامل

A Triple State Time Variant Cost Function Unit Commitment with Significant Vehicle to Grid Penetration

Hastening the power industry toward smart operation juxtaposed with the unrivaled restructuring and privatization agendas, some of the ubiquitous smart grid advantages are glanced more and more. Recently, the vehicle to grid (V2G) technology, as one of these beneficial aspects, has found a worldwide attention due to its important advantages. The V2G technology can raise the system operation eff...

متن کامل

Optimal Scheduled Unit Commitment Considering Wind Uncertainty Using Cuckoo Search Algorithm

In this paper, a new method to review the role of wind units as an energy-producer in the scheduling problem of unit commitment is presented. Today, renewable energy sources due to lack of environmental pollution, absence of dependence on fossil fuels, and consequently a very low marginal cost, have been receiving considerable attention in power system. But these sources are associated with unc...

متن کامل

An adaptive modified firefly algorithm to unit commitment problem for large-scale power systems

Unit commitment (UC) problem tries to schedule output power of generation units to meet the system demand for the next several hours at minimum cost. UC adds a time dimension to the economic dispatch problem with the additional choice of turning generators to be on or off.  In this paper, in order to improve both the exploitation and exploration abilities of the firefly algorithm (FA), a new mo...

متن کامل

Unit Commitment in Presence of Wind Power Plants and Energy Storage

As renewable energy increasingly penetrates into power grid systems, new challenges arise for system operators to keep the systems reliable under uncertain circumstances, while ensuring high utilization of renewable energy. This paper presents unit commitment (UC) which takes into account the volatility of wind power generation. The UC problem is solved with the forecasted intermittent wind pow...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014