Delay Controllability: Multi-Agent Coordination under Communication Delay
نویسندگان
چکیده
Simple Temporal Networks with Uncertainty provide a useful framework for modeling temporal constraints and, importantly, for modeling actions with uncertain durations. To determine whether we can construct a schedule for a given network, we typically consider one of two types of controllability: dynamic or strong. These controllability checks have strict conditions on how uncertainty is resolved; uncertain outcomes are either recognized immediately or not at all. In this paper, we introduce delay controllability, a novel generalization of both strong and dynamic controllability that additionally exposes a large range of controllability classes in between. To do so, we use a delay function γ to parameterize our controllability checking. This delay function represents the difference between when an event happens and the time that it is observed. We also provide a single unified algorithm for checking delay controllability that runs in O(n) time, matching the best known runtime for dynamic controllability, which we use to motivate the decision to generalize dynamic and strong controllability. We conclude by providing an empirical evaluation of delay controllability, demonstrating its superior accuracy and practical efficiency as compared to other existing approximations.
منابع مشابه
Adaptive Consensus Control for a Class of Non-affine MIMO Strict-Feedback Multi-Agent Systems with Time Delay
In this paper, the design of a distributed adaptive controller for a class of unknown non-affine MIMO strict-feedback multi agent systems with time delay has been performed under a directed graph. The controller design is based on dynamic surface control method. In the design process, radial basis function neural networks (RBFNNs) were employed to approximate the unknown nonlinear functions. S...
متن کاملControllability of multi-agent systems with time-delay in state and switching topology
In this article, the controllability issue is addressed for an interconnected system of multiple agents. The network associated with the system is of the leader–follower structure with some agents taking leader role and others being followers interconnected via the neighbour-based rule. Sufficient conditions are derived for the controllability of multi-agent systems with time-delay in state, as...
متن کاملCoordination of Multi-agent Systems with Communication Delays ⋆
In this paper, we investigate coordination of a network of second-order dynamic agents under communication delays. Based on the frequency-domain analysis and matrix theory, the necessary and sufficient conditions for the system converging to stationary consensus and dynamic consensus are obtained, respectively. The conditions depend on the communication delay, the eigenvalues of the Laplacian m...
متن کاملCoordination and profit sharing in a two-level supply chain under periodic review inventory policy with delay in payments contract
In this paper,a coordination model has been investigated for a two-level supply chain (SC) consisting of one retailer and one supplier under periodic review inventory system. The review period and the retailer’s safety factorare assumed to be decision variables. The retailer faces stochastic demand following a normal distribution with known mean and variance. Moreover, it is assumed that unmet ...
متن کاملDistributed H∞ coordination of multi-agent systems with directed switching topology and time-delay
In this paper, we consider multi-agent H∞ consensus control problems with external disturbance under directed switching topologies. Both switching networks with and without time-delay are taken into consideration. By the model transformation, the multi-agent H∞ control problem is converted into the switching linear system H∞ control problem with special structure. Based on graph theory and comm...
متن کامل