ICT Priority Deliverable D 5 . 3 : “ Complete Observational Learning Architecture ”

نویسنده

  • Christian Eitzinger
چکیده

Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Novelty Detection and Learning Drives

Deliverable due: 30 April 2011 Deliverable submission: 30 April 2011 Funding Institution: European Commission (European Union) Project Officer: Cécile Huet Funded under: Seventh Framework Programme Work Programme Theme 3: ICT – Information and Communication Technology; Call identifier: FP7-ICT-2007-3; Challenge 2: Cognitive Systems, Interaction, and Robotics; Objective: ICT-2007.2.2 Cognitive S...

متن کامل

ICT Priority Deliverable D 3 . 1 : “ Baseline Object Recognition System ”

Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission RE Restricted to a group specified by the consortium (including the Commission CO Confidential, only for members of the consortium (including the Commission Services)

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013