Accurately Predicting Post-editing Time & La- bor for Cost-Management

نویسنده

  • Carla Schelfhout
چکیده

This paper will describe a way of assessing the post-editing effort for a specific project, language and engine combination. This serves as a tool for LSPs to estimate the necessary effort on the project and quote accordingly.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

A Neural Network Architecture for Detecting Grammatical Errors in Statistical Machine Translation

In this paper we present a Neural Network (NN) architecture for detecting grammatical errors in Statistical Machine Translation (SMT) using monolingual morpho-syntactic word representations in combination with surface and syntactic context windows. We test our approach on two language pairs and two tasks, namely detecting grammatical errors and predicting overall post-editing effort. Our result...

متن کامل

Economic Performance Analysis of Selected Military Hospitals Using Hospital Indicators and Inpatient Bed-Day Cost

Background: Hospitals, the main providers of healthcare services, are costly centers which account for about 80% of the health sector budget and have a huge share of resources. Objective: This study aimed to analyze the economic performance of selected military hospitals in Tehran using hospital indicators and inpatient bed-day costs. Method...

متن کامل

Questing for Quality Estimation A User Study

Post-Editing of Machine Translation (MT) has become a reality in professional translation workflows. In order to optimize the management of projects that use post-editing and avoid underpayments and mistrust from professional translators, effective tools to assess the quality of Machine Translation (MT) systems need to be put in place. One field of study that could address this problem is Machi...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015