Spatiotemporal management under heterogeneous damage and uncertain parameters. An agent-based approach
نویسنده
چکیده
منابع مشابه
Adaptive Distributed Consensus Control for a Class of Heterogeneous and Uncertain Nonlinear Multi-Agent Systems
This paper has been devoted to the design of a distributed consensus control for a class of uncertain nonlinear multi-agent systems in the strict-feedback form. The communication between the agents has been described by a directed graph. Radial-basis function neural networks have been used for the approximation of the uncertain and heterogeneous dynamics of the followers as well as the effect o...
متن کاملA multi agent method for cell formation with uncertain situation, based on information theory
This paper assumes the cell formation problem as a distributed decision network. It proposes an approach based on application and extension of information theory concepts, in order to analyze informational complexity in an agent- based system, due to interdependence between agents. Based on this approach, new quantitative concepts and definitions are proposed in order to measure the amount of t...
متن کاملA Robust Scenario Based Approach in an Uncertain Condition Applied to Location-Allocation Distribution Centers Problem
The paper discusses the location-allocation model for logistic networks and distribution centers through considering uncertain parameters. In real-world cases, demands and transshipment costs change over the period of the time. This may lead to large cost deviation in total cost. Scenario based robust optimization approaches are proposed where occurrence probability of each scenario is not know...
متن کاملA Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...
متن کاملDeveloping Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کامل