In this paper, we present dominance conditions for the single machine weighted earliness scheduling problem with no idle time. We also propose an algorithm that can be used to improve upper bounds for the weighted earliness criterion and lower bounds for an earliness/tardiness problem. The computational tests show that the algorithm is superior to an initial heuristic schedule and an existing adjacency condition. 2006 Elsevier Ltd. All rights reserved.
منابع مشابه
A New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملSolving the Single Machine Problem with Quadratic Earliness and Tardiness Penalties
Nowadays, scheduling problems have a considerable application in production and service systems. In this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. In many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combin...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کاملThe Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System
Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs. In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flowtime through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters with it, this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 51 شماره
صفحات -
تاریخ انتشار 2006