On-line decision support for take-off runway scheduling with uncertain taxi times at London Heathrow airport

نویسندگان

  • Jason A. D. Atkin
  • Edmund K. Burke
  • John S. Greenwood
  • Dale Reeson
چکیده

This paper addresses the challenge of building an automated decision support methodology to tackle the complex problem faced every day by runway controllers at London Heathrow Airport. Aircraft taxi from stands to holding areas at the end of the current take-off runway where they wait in queues for permission to take off. A runway controller attempts to find the best order for aircraft to take off. Sequence-dependent separation rules that depend upon aircraft size, departure route and speed group ensure that this is not a simple problem to solve. Take-off time slots on some aircraft and the need to avoid excessive delay for any aircraft make this an even more complicated problem. Making this decision at the holding area helps to avoid the problems of unpredictable push-back and taxi times, but introduces a number of complex spatial constraints that would not otherwise exist. The holding area allows some flexibility for interchange of aircraft between queues, but this is limited by the physical layout of the current holding area. These physical constraints are not usually included in academic models of the departure problem However, any decision support system for the takeoff runway controller must include them. We show, in this paper, that a decision support system could help the controllers to significantly improve the departure sequence at busy times of the day, by considering the taxiing aircraft in addition to those already at the holding area. However, undertaking

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Departure Runway Scheduling at London Heathrow Airport Extended Abstract

London Heathrow airport is one of the busiest airports in the world as it is very popular with both airlines and passengers. The capacity of the departure system at Heathrow is limited by the capacity of the runway. It is therefore imperative to maximise the throughput of the single available departure runway. Aircraft taxi from the stands to the ends of the runway where they queue in holding p...

متن کامل

On-line decision support for take-off runaway scheduling at London Heathrow Airport

The research problem considered in this thesis was presented by NATS, who are responsible for the take-off runway scheduling at London Heathrow airport. The sequence in which aircraft take off is very important and can have a huge effect upon the throughput of the runway and the consequent delay for aircraft awaiting take-off. Sequence-dependent separations apply between aircraft at take-off, s...

متن کامل

An examination of take-off scheduling constraints at London Heathrow airport

In this paper, we focus upon the departure system for London Heathrow airport, one of the busiest airports in the world. Decreasing the delay for aircraft awaiting take-off with their engines running would decrease fuel usage and have consequent cost and pollution benefits. We explain how the departure system at Heathrow currently works and we describe the various constraints that apply to take...

متن کامل

Hybrid metaheuristics to aid runway scheduling under uncertainty at London Heathrow airport

London Heathrow Airport is a very popular and busy airport. Indeed it is one of the busiest airports in the world. In order to control noise for residents on flight paths, only one of Heathrow’s two parallel runways can be used for departures at any given time. We aim to increase the throughput of the departure system, and in particular the runway, which is a bottleneck for the whole system. Mi...

متن کامل

A comparison of two methods for reducing take-off delay at London Heathrow airport

This paper describes recent research into the departure process at London Heathrow, with the primary motivation of reducing the amount of fuel used, improving both the economic and environmental cost. Two proposals are considered here. The first proposal considers the practicality and potential benefits of aiding the controller to improve the take-off sequencing. The second proposal aims to abs...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • J. Scheduling

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2008