CS 524 Project : StarCraft Mixed Integer Program

نویسنده

  • David Merrell
چکیده

StarCraft is a real-time strategy PC game released by Blizzard Entertainment in 1998. It is widely regarded as the defining game of the genre, receiving broad critical acclaim and many years of commercial success. The game retains a large and loyal fanbase and is a popular e-sport, especially in Korea. StarCraft also contributes to artificial intelligence research, serving as a testbed for agent design competitions.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Valid inequalities for mixed integer linear programs

This tutorial presents a theory of valid inequalities for mixed integer linear sets. It introduces the necessary tools from polyhedral theory and gives a geometric understanding of several classical families of valid inequalities such as lift-and-project cuts, Gomory mixed integer cuts, mixed integer rounding cuts, split cuts and intersection cuts, and it reveals the relationships between these...

متن کامل

The project portfolio selection and scheduling problem: mathematical model and algorithms

This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...

متن کامل

Global Supply Chain Management under Carbon Emission Trading Program Using Mixed Integer Programming and Genetic Algorithm

In this paper, the transportation problem under the carbon emission trading program ismodelled by mathematical programming and genetic algorithm. Since green supply chain issuesbecome important and new legislations are taken into account, carbon emissions costs are included inthe total costs of the supply chain. The optimisation model has the ability to minimise the total costsand provides the ...

متن کامل

Scheduling a Project to Minimize Costs of Material Requirements

Traditionally, project scheduling and material planning have been treated independently. In this research, a mixed integer programming model is presented to integrate project scheduling and materials ordering problems. The goal is to minimize the total material holding and ordering costs. In addition, an efficient metaheuristic algorithm is proposed to solve the model. The proposed algorithm is...

متن کامل

On optimizing over lift-and-project closures

The lift-and-project closure is the relaxation obtained by computing all lift-and-project cuts from the initial formulation of a mixed integer linear program or equivalently by computing all mixed integer Gomory cuts read from all tableau’s corresponding to feasible and infeasible bases. In this paper, we present an algorithm for approximating the value of the lift-and-project closure. The orig...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016