Integrated Approach to Machine Guidance and Operations Monitoring in Tunnel Construction

نویسندگان

  • X. Shen
  • M. Lu
  • S. Mao
چکیده

Tunnel construction method using a tunnel boring machine (TBM) is commonly adopted for building underground infrastructure, such as railways, roads, sewers, or utility pipelines. TBM tunnelling entails precise guidance of the machine in the underground space, as well as effective construction management and project control. The research aims to address critical engineering and management problems during the course of tunnel excavation, including TBM guidance, automated asbuilt data acquisition, real-time data processing and 3D visualization. In this paper, we propose an integrated TBM guidance and operations monitoring solution for tunneling applications. A robotic total station is employed to automate the continuous processes of TBM tracking and guidance inside the tunnel. Wireless sensor networks are particularly implemented for on-site data communication. The results of TBM's position state, tunnel alignment and construction progress are processed and presented in straightforward, user-friendly interfaces on the fly. Working with the City of Edmonton, Alberta, Canada, the integrated system has been implemented in the construction of a 2.4-meterdiameter and 1-km-long sewage tunnel project and undergone seven-month field testing in 2013. The solution lends substantial support to TBM operators and project managers in making critical decisions on a near real-time basis.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated simulation-DEA approach to multi-criteria ranking of scenarios for execution of operations in a construction project

The purpose of this study is to examine different scenarios for implementing operations in the pre-construction phase of a project, based on several competing criteria with different importance levels in order to achieve a more efficient execution plan. This paper presents a new framework that integrates discrete event simulation (DES) and data envelopment analysis (DEA) to rank different scena...

متن کامل

Tunnel design and construction process in difficult ground conditions with Analysis of Controlled Deformations (ADECO) approach; a Case Study

The 10.6 km long Sabzkuh water conveyance tunnel is currently under construction in High Zagros structural zone, located in western Iran, has used conventional (in section T1) and mechanized (in section T2) methods. The section T1 of the tunnel driven through alluvial geological units with great complexity in an area high potential for sliding and water-bearing fault which has made the excavati...

متن کامل

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

A Comprehensive Mathematical Model for the Design of a Dynamic Cellular Manufacturing System Integrated with Production Planning and Several Manufacturing Attributes

    Dynamic cellular manufacturing systems,   Mixed-integer non-linear programming,   Production planning, Manufacturing attributes   This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensi...

متن کامل

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014