A lot size model with random yields for investing to setup cost reduction under a limited capital budget
نویسندگان
چکیده
In this paper, the study attempts to determine the optimal capital investment in setup cost reduction and optimal lot sizing policies for an economic order quantity (EOQ) model with random yields. The setup cost is treated as the function of capital expenditure in technology. The study shows that the expected total annual cost functions with capital investment is convex and develop a solution procedure to determine the optimal lot sizes and the capital investment in setup cost reduction with a limited capital budget. Finally, a numerical example is presented to illustrate the results and compared to the results without considering capital investment. These results evidently show that significant costs savings can be obtained through capital investment in setup cost reduction. In addition, the sensitivity analysis is also included.
منابع مشابه
Integrated JIT Lot-Splitting Model with Setup Time Reduction for Different Delivery Policy using PSO Algorithm
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multi...
متن کاملAn Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
متن کاملOptimal Lot Sizing and Setup Cost Reduction for Deteriorating Production System
In this paper, we extend Porteus (1986) to generalize the economic production quantity (EPQ) model with finite production rate and to derive an exact expression for the expected total annual cost function when maintenance actions and capital investment in setup cost reduction are adopted. In addition, the uniqueness property of the optimal lot size and the bounds of optimal lot size are derived...
متن کاملInvesting in Lead-Time Variability Reduction in a Quality-Adjusted Inventory Model with Finite-Range Stochastic Lead-Time
We study the impact of the efforts aimed at reducing the lead-time variability in a quality-adjusted stochastic inventory model. We assume that each lot contains a random number of defective units. More specifically, a logarithmic investment function is used that allows investment to be made to reduce lead-time variability. Explicit results for the optimal values of decision variables as well a...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کامل