Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine
نویسندگان
چکیده
A new multistage stochastic mine production scheduling approach is developed and tested in a large operating gold mine. The approach takes short scale orebody information in the form of grade control data into account. As simulated orebodies used in stochastic long term mine planning are based on sparse exploration data while grade control data are unavailable at the time of production scheduling, the short scale information is simulated stochastically. Stage 1 of the approach simulates high density future grade control data based on exploration data and grade control in previously mined out parts of a deposit. In stage 2, the technique of conditional simulation by successive residuals enables preexisting simulated orebody models to be updated using the simulated future grade control information. Stage 3 is based on a stochastic programming mine scheduling formulation that handles jointly multiple simulated orebody models from stage 2, and accommodates both maximising net present value (NPV) and minimising deviations from expected production targets. Stage 4 includes quantification of risk in the production schedules generated, comparisons and reporting. The application at a large operating gold mine demonstrates that the proposed approach is practical, and adds value to the operation. The approach is shown to deliver additional ore (3?6 Mt more) and metal (2?6 Mg more) which matches the mines reconciliations, unlike the conventional schedule, and results in a cumulative NPV which is on average 7?7 million AUD higher than that of a stochastic schedule without the simulated grade control data. The NPV is 230 million AUD higher compared to the NPV from the actual schedule of the mine. An additional key contribution of the proposed approach is the compliance of shortto long term production schedules and performance, leading to higher probability of meeting production targets and increased productivity. Given the capital intensity of mining projects, this contribution can be critically important to mining operations.
منابع مشابه
Resilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملAn imperialist competitive algorithm for solving the production scheduling problem in open pit mine
Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کامل