The Basic Cyclic Scheduling Problem with Linear Precedence Constraints
نویسنده
چکیده
In this paper, we consider a nite set of generic tasks that we execute a large number of times. We introduce the linear constraints between two generic tasks : the di erence of iteration indices between the execution of two tasks subject to a precedence constraint is a linear function of these indices. These constraints are modeled by a linear graph G. Moreover, we consider no resource constraints. We aim at characterizing the optimal frequencies of the generic tasks. Since the executions of the generic tasks are only subject to precedence constraints, the maximum frequencies are achieved in the earliest schedule. The study of its asymptotic behavior allows us to develop an algorithm to compute the maximum frequencies of the generic tasks : it is based on a particular decomposition of the linear graph and on the expansion of its components. We construct a valued graph by contracting these components and we show that the longest paths of that graph provide the maximum values of the frequencies.
منابع مشابه
SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملModified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملA Constraint Based Approach to Cyclic RCPSP
A cyclic scheduling problem is specified by a set of activities that are executed an infinite number of times subject to precedence and resource constraints. The cyclic scheduling problem has many applications in manufacturing, production systems, embedded systems, compiler design and chemical systems. This paper proposes a Constraint Programming approach based on Modular Arithmetic, taking int...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Discrete Applied Mathematics
دوره 64 شماره
صفحات -
تاریخ انتشار 1996