Simulation Method for Evaluation of Lng Receiving Terminal Capacity

ثبت نشده
چکیده

Owing to ever increasing share of the natural gas in the world consumption of the power sources, the international maritime traffic with the liquefied gas is recording constant growth with even greater future anticipations. It results in the need for the construction of new LNG receiving terminals. In order to be integrated in those trends and to make provisions for additional quantities of power sources necessary for its future economic development, the Republic of Croatia is making plans for the construction of such a terminal. Successful planning and designing of LNG terminal depends on the application of appropriate methodology for the evaluation of terminal capacity. This paper gives a simulation method for the evaluation of receiving LNG terminal capacity.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulation Model for Optimization of the Internal Handling Fleet Size at Shahid Rajaee Container Port Based on Performance Evaluation

The dramatic increasing of sea-freight container transportations and the developing trend for using containers in the multimodal handling systems through the sea, rail, road and land in the present market cause some challenges to the general managers of container terminals such as increasing demand, competitive situation, new investments and expansion of new activities and the need to use new m...

متن کامل

Review on Economical Efficiency of Lng Cold Energy Use in South Korea

About 10 years ago, Korea Gas Corporation (KOGAS) carried out a feasibility study on businesses using Liquefied Natural Gas (LNG) for cold power generation, air separation, cryogenic crushing, frozen food storage, and carbonic acid. Recently, an air liquefaction plant started operations near Pyungtaek Receiving Terminal (R/T) and a cryogenic crushing plant is now partially operating near Tongyo...

متن کامل

Seismic Performance Evaluation of Boil-Off Gas Compressor in LNG Terminal

Liquefied natural gas (LNG) terminals, one of the lifeline facilities, need to be protected by a proper seismic design against extreme earthquakes. An LNG terminal consists of a series of process facilities that are connected by pipelines of various sizes. Boil-off gas (BOG) compressor is one of the critical process facilities whose failure will cause the functional failure of the LNG terminal....

متن کامل

Dynamic simulation : a case study

P lanta de Regasificacion de Sagunto, S.A (Saggas) is constructing a new LNG receiving facility in Sagunto, 50 km north of Valencia (Spain), with a capacity of 3 million tpy of LNG, to be supplied from Egypt through a project initially promoted by Union Fenosa. Saggas is owned by three major electric companies in Spain: Union Fenosa (50%), Iberdrola (30%) and Endesa (20%). Saggas will be in cha...

متن کامل

Predicting the Liquid Density of Gas Condensates and LNG Mixtures from Equations of State

In this contribution, two approaches are followed to predict the saturated liquid density of liquefied natural gas (LNG) mixtures. In one approach, 12 cubic equations of state (EoSs), comprising the popular Peng-Robinson (PR) and Redlich-Kwong-Soave (RKS), are employed to predict the saturated liquid density of 20 LNG mixtures. In the other approach, these EoS are used in conjunction with a rec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012