Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs

نویسندگان

  • A. Federgruen
  • G. Mosheiov
چکیده

W e consider multimachine scheduling problems with earliness and tardiness costs. We first analyze problems in which the cost of a job is given by a general nondecreasing, convex function F of the absolute deviation of its completion time from a (common) unrestrictive duedate, and the objective is to minimize the sum of the costs incurred for all N jobs. (A special case to which considerable attention is given is the completion time variance problem.) We derive an easily computable lower bound for the minimum cost value and a simple "Altemating Schedule" heuristic, both of which are computable in O(N log N) time. Under mild technical conditions with respect to F, we show that the worst case optimality (accuracy) gap of the heuristic (lower bound) is bounded by a constant as well as by a simple function of a single measure of the dispersion among the processing times. We also show that the heuristic (bound) is asymptotically optimal (accurate) and characterize the convergence rate as O(N-2) under very general conditions with respect to the function F. In addition, we report on a numerical study showing that the average gap is less than 1% even for problems with 30 jobs, and that it falls below 0.1% for problems with 90 or more jobs. This study also establishes that the empirical gap is almost perfectly proportional with N-2, as verified by a regression analysis. Finally, we generalize the heuristic to settings with a possibly restrictive due date and general asymmetric, and possibly nonconvex, earliness and tardiness cost functions and demonstrate its excellent performance via a second numerical study. (Multimachine Scheduling; Earliness and Tardiness Costs; Heuristics; Worst Case; Asymptotic and Probabilistic Analysis)

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey

The just-in-time production philosophy has led to a growing interest in scheduling problems considering both earliness and tardiness penalties. Most publications considering these so-called non-regular objective functions are devoted to single machine problems. In the case of multi-machine problems, there are some papers dealing with parallel machine problems. However, for multi-operation sched...

متن کامل

Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production

Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...

متن کامل

Dynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness

This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...

متن کامل

An efficient meta-heuristic for the single machine common due date scheduling problem

A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...

متن کامل

A Scatter Search Algorithm for the RCPSP with Discounted Weighted Earliness-Tardiness Costs

In this paper, we study a resource-constrained project scheduling problem in which a set of project activities have due dates. If the finish time of each one of these activities is not equal to its due date, an earliness or a tardiness cost exists for each tardy or early period. The objective is to minimize the sum of discounted weighted earliness-tardiness penalty costs of these activities. Sc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008