Three Management Policies for a Resource with Partition Constraints 1
نویسنده
چکیده
Management of a buuerless resource is considered under non-homogeneous demand consisting of one-unit and two-unit requests. Two-unit requests can be served only by a given partition of the resource. Three simple admission policies are evaluated with regard to revenue generation. One policy involves no admission control and two policies involve trunk reservation. A limiting regime in which demand and capacity increase in proportion is considered. It is shown that each policy is asymptotically optimal for a certain range of parameters. Limiting dynamical behavior is obtained via a theory developed by Hunt and Kurtz. The results also point out the remarkable eeect of partition constraints.
منابع مشابه
A Multi Objective Optimization Approach for Resources Procurement of Bank
Calculating total cast of bank resources procurement methods which include current -free loan deposit, saving interest-free loan deposit, regular and net short-term investment deposit, long-term investment deposit and surety bond cash deposit and presenting their optimal integration require precise scientific studies. Hence, this study is an attempt to know which methods are the best optimal in...
متن کاملMemory Conscious Task Partition and Scheduling in Grid Environments
While resource management and task scheduling are identified challenges of Grid computing, current Grid scheduling systems mainly focus on CPU and network availability. Recent performance improvement of CPU and computer network has made memory usage a significant factor of overall performance. In this study, we consider memory availability as a performance factor and introduce memory conscious ...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملPolicies in a Resource Manager of Workflow Systems: Modeling, Enforcement and Management
workflow, resource, policy, interval-based, query rewriting This paper proposes a new method to handle policies in Resource Management of Workflow Systems. Three types of policies are studied including qualification, requirement and substitution policies. The first two types of policies map an activity specification into constraints on resources that are qualified to carry out the activity. The...
متن کاملOptimum allocation of Iranian oil and gas resources using multi-objective linear programming and particle swarm optimization in resistive economy conditions
This research presents a model for optimal allocation of Iranian oil and gas resources in sanction condition based on stochastic linear multi-objective programming. The general policies of the resistive economy include expanding exports of gas, electricity, petrochemical and petroleum products, expanding the strategic oil and gas reserves, increasing added value through completing the petroleum...
متن کامل