Study on the Stochastic Chance-Constrained Fuzzy Programming Model and Algorithm for Wagon Flow Scheduling in Railway Bureau

نویسندگان

  • Bin Liu
  • Wuhong Wang
چکیده

The wagon flow scheduling plays a very important role in transportation activities in railway bureau. However, it is difficult to implement in the actual decision-making process of wagon flow scheduling that compiled under certain environment, because of the interferences of uncertain information, such as train arrival time, train classify time, train assemble time, and flexible trainsize limitation. Based on existing research results, considering the stochasticity of all kinds of train operation time and fuzziness of train-size limitation of the departure train, aimed at maximizing the satisfaction of departure train-size limitation and minimizing the wagon residence time at railway station, a stochastic chance-constrained fuzzy multiobjective model for flexible wagon flow scheduling problem is established in this paper. Moreover, a hybrid intelligent algorithm based on ant colony optimization ACO and genetic algorithm GA is also provided to solve this model. Finally, the rationality and effectiveness of the model and algorithm are verified through a numerical example, and the results prove that the accuracy of the train work plan could be improved by the model and algorithm; consequently, it has a good robustness and operability.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Model and Solution Approach for Multi objective-multi commodity Capacitated Arc Routing Problem with Fuzzy Demand

The capacitated arc routing problem (CARP) is one of the most important routing problems with many applications in real world situations. In some real applications such as urban waste collection and etc., decision makers have to consider more than one objective and investigate the problem under uncertain situations where required edges have demand for more than one type of commodity. So, in thi...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

CREDIBILITY-BASED FUZZY PROGRAMMING MODELS TO SOLVE THE BUDGET-CONSTRAINED FLEXIBLE FLOW LINE PROBLEM

This paper addresses a new version of the exible ow line prob- lem, i.e., the budget constrained one, in order to determine the required num- ber of processors at each station along with the selection of the most eco- nomical process routes for products. Since a number of parameters, such as due dates, the amount of available budgets and the cost of opting particular routes, are imprecise (fuzz...

متن کامل

ORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming

Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...

متن کامل

Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm

Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014