Electric Generation Capacity in New England in 1995 Richard Norgaard

نویسندگان

  • Richard Norgaard
  • Peter Luh
  • Shi-Chung Chang
چکیده

This study uses a capacity planning model to determine an optimal mix of generating plants for New England in the year 1995. The results indicate that New England has excess capacity in the generation of intermediate load and insufficient capacity in the generation of base load. The current intermediate load capacity is almost entirely oil-fired. and in 1995 it will have an average age of 35 years. The implication of the model is that the intermediate capacity is obsolete.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Role of Electric Vehicles Parking Lots and Storage Systems on the Penetration Rate of Distributed Generation and Network Reconfiguration

Introduction of new technologies such as energy storage systems, electric vehicles, and distributed generation improved the characteristics of networks. On other hand, using these components in distribution systems improves system performances such as power losses. One of effective methods for improving system characteristics is distribution network reconfiguration. In this study, in addition t...

متن کامل

Green Energy Generation in Buildings: Grid-Tied Distributed Generation Systems (DGS) With Energy Storage Applications to Sustain the Smart Grid Transformation

The challenge of electricity distribution’s upgrade to incorporate new technologies is big, and electric utilities are mandated to work diligently on this agenda, thus making investments to ensure that current networks maintain their electricity supply commitments secure and reliable in face of disruptions and adverse environmental conditions from a variety of sources. The paper presents a new ...

متن کامل

Dynamic Planning the Expansion of Electric Energy Distribution Systems Considering Distributed Generation Resources in the Presence of Power Demand Uncertainty

In this paper, a new strategy based on a dynamic (time-based) model is proposed for expansion planning of electrical energy distribution systems, taking into account distributed generation resources and advantage of the techno-economic approach. In addition to optimal placement and capacity, the proposed model is able to determine the timing of installation / reinforcement of expansion options....

متن کامل

CLIMATE CHANGE AND COMPETITION – ON A COLLISION COURSE? Technology Development and Deployment in a Competitive Electric Industry

To see how difficult it will be for mature industrialized nations to achieve sustained reductions in CO2 and other greenhouse gases we look at a total of fourteen alternative resource strategies for New England and Switzerland. Table One shows the energy mixes used to generate electricity in recent years for the two regions. Two years are shown for New England, as the current disposition of the...

متن کامل

Application of Demand Response Programs to Heavy Industries: a Case Study on a Regional Electric Company

In recent years, incremental rate of electrical demands made many challenges for policy makers of power systems. Besides, due to economic crisis and environmental concerns about the air pollution, the new investments in thermal power generation units have experienced a noticeable reduction. For this reason, the power system operators should propose novel approaches to make a balance between inc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010