Evaluation of a large-scale implementation of disease management programmes in various Dutch regions: first results

نویسندگان

  • A.P Nieboer
  • M.J.E te Vaarwerk
چکیده

Background: Disease management programmes (DMPs) aim to level off the rising trend in chronic diseases, to prevent or postpone complications and co-morbidities and above all to increase the level of self-management and quality of life of chronically-ill patients. Although evidence on the cost-effectiveness of DMPs is partly available, many questions still remain. Benefits of disease management in a range of DMPs on the patient, professional and organisational level are evaluated by capturing the results in a single conceptual framework, employing comparable structure, process, and outcome measures. First results of cardiovascular DMPs are presented. Methods: To describe the cardiovascular DMPs we used a methodological approach that combines qualitative and quantitative (mixed) research methods, enabling a thorough and comprehensive evaluation of complex cardiovascular programmes. Results: Our study showed that each cardiovascular DMP consists of a combination of patient-related, professional, and organizational interventions. The exact programme components for each programme vary, however. Conclusion: Our results showed that disease management level, costs, health care utilization, patient characteristics, health behaviours, self-management abilities, and health of CVD patients all varied widely between the cardiovascular DMPs. These variations are expected to influence outcomes and cost-effectiveness of the cardiovascular DMPs.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluation of a large scale implementation of disease management programmes in various Dutch regions: a study protocol

BACKGROUND Disease management programmes (DMPs) have been developed to improve effectiveness and economic efficiency within chronic care delivery by combining patient-related, professional-directed, and organisational interventions. The benefits of DMPs within different settings, patient groups, and versions remain unclear. In this article we propose a protocol to evaluate a range of current DM...

متن کامل

Investigating the Use of Oil Revenues with the Assumption of Dutch Disease in Different Economic Sectors of Iran: a Dynamic Computable General Equilibrium (DCGE) Approach

The use of revenue from natural resources, including oil, has always attracted the attention of politicians, economists and political scientists as well as various social groups. Here, we study the optimal consumption of oil revenues under different interest rate and social discount rate scenarios, and presence of Dutch disease, using a dynamic computable general equilibrium approach.The result...

متن کامل

Prevention in primary care: facilitators and barriers to transform prevention from a random coincidence to a systematic approach.

RATIONALE, AIMS AND OBJECTIVES The Dutch general practitioner (GP) plays a substantial role in prevention. At the same time, many GPs hesitate to incorporate large-scale cardiovascular risk management (CVRM) programmes into their daily practice. By exploring facilitators and barriers occurring during the past three decades, we wish to find clues on how to motivate professionals to adopt and imp...

متن کامل

Oil Overdependence and Dutch Disease, KSA Evidence

In the context of recent oil prices fall and resulting budgetary problems faced by KSA, it is very interesting to examine the country’s overdependence on oil revenues. In this paper, we examine whether extreme oil dependence for Saudi Arabia is the symptom of Dutch Disease. We first provide a brief review of the literature on Dutch Disease and the natural resource curse. We then discuss the sym...

متن کامل

Towards Measuring the Project Management Process During Large Scale Software System Implementation Phase

Project management is an important factor to accomplish the decision to implement large-scale software systems (LSS) in a successful manner. The effective project management comes into play to plan, coordinate and control such a complex project. Project management factor has been argued as one of the important Critical Success Factor (CSF), which need to be measured and monitored carefully duri...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2011