Time is money", or so goes the old saying. Perhaps influenced by this aphorism, some strategies for incorporating costs in the analysis of software design express all costs in currency units for reasons of simplicity and tractability. Indeed, in theoretical economics all costs can, in principle, be expressed in dollars. Software engineering problems, however, often present situations in which converting all costs to a common currency is problematical. In this paper we pinpoint some of these situations and the underlying causes of the problems, and we argue that it is often better to treat costs as a multidimensional value, with dimensions corresponding to distinct types of resources. We go on to highlight the differences among cost dimensions that need to be considered when developing cost-benefit analyses, and we suggest mechanisms for mediating among heterogeneous cost dimensions.
منابع مشابه
Introducing the Time Value of Money in a Non-consignment Vendor Managed Inventory Model
Vendor managed inventory (VMI) is an integrated approach for buyer–vendor coordination, according to which the vendor (supplier or manufacturer) decides on the appropriate buyer’s (retailer’s) inventory levels. The time value of money has not traditionally been considered in evaluating VMI supply chain’s total inventory cost in any studies up to now. Therefore, in the present study a new model ...
متن کاملAnalytical D’Alembert Series Solution for Multi-Layered One-Dimensional Elastic Wave Propagation with the Use of General Dirichlet Series
A general initial-boundary value problem of one-dimensional transient wave propagation in a multi-layered elastic medium due to arbitrary boundary or interface excitations (either prescribed tractions or displacements) is considered. Laplace transformation technique is utilised and the Laplace transform inversion is facilitated via an unconventional method, where the expansion of complex-valued...
متن کاملPresenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
The time - cost tradeoff problem is one of the most critical issues in the project scheduling field and so far, a lot of research has been done with a variety of quantitative and qualitative approaches on this subject. In this research, we intend to provide a two - objective mathematical model which balances crash and delay for activities. So that it provides the right tools for decision makers...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملA new model for Physical flow optimization in the global automotive value chain (Case study: SIBA MOTOR Company)
Taking into account the economic capabilities, competitive advantages and environment dynamics, this research presents a new physical flow optimization model by considering payment period, time value of money and exchange rate fluctuations. Considering the actual circumstances of the current case study in the global value chain, a single-objective non-linear mathematical model is presented for ...
متن کامل