Investment and Uncertainty With Time to Build: Evidence from Entry into U.S. Copper Mining

ثبت نشده
چکیده

The standard real–options model predicts that increased uncertainty discourages investment. When projects are large and take time to build, however, that prediction can be reversed. We investigate the investment/uncertainty relationship empirically using historical data on opening dates of new U.S. copper mines — large, irreversible projects with substantial construction lags. Both the timing of the decision to go forward and the price thresholds that trigger that decision are assessed. In particular, we build upon a reduced form analysis to construct a structural model of entry. We find that, in this market, greater uncertainty encourages investment and lowers the price thresholds for many mines. JEL classifications: G11, L72, Q39

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Approximate resistivity and susceptibility mapping from airborne electromagnetic and magnetic data, a case study for a geologically plausible porphyry copper unit in Iran

This paper describes the application of approximate methods to invert airborne magnetic data as well as helicopter-borne frequency domain electromagnetic data in order to retrieve a joint model of magnetic susceptibility and electrical resistivity. The study area located in Semnan province of Iran consists of an arc-shaped porphyry andesite covered by sedimentary units which may have potential ...

متن کامل

Copper Price Prediction using Wave Count with Contribution of Elliott Waves

Within the last few decades, copper has been identified as one of the most applicable metals by many researchers. These researchers have also been enthusiastic to predict the price of this valuable metal. These days, the available technical analysis methods have been highly applied in the financial markets. Moreover, the researchers have used these methods to predict the suitable price tr...

متن کامل

A Hybrid Business Success Versus Failure Classification Prediction Model: A Case of Iranian Accelerated Start-ups

The purpose of this study is to reduce the uncertainty of early stage startups success prediction and filling the gap of previous studies in the field, by identifying and evaluating the success variables and developing a novel business success failure (S/F) data mining classification prediction model for Iranian start-ups. For this purpose, the paper is seeking to extend Bill Gross and Robert L...

متن کامل

Effect of grinding time on flotation recovery of copper smelting slags in Bardaskan district

Copper smelting slags are hard materials. Therefore,to recover their copper by flotation method, grinding should be carried out to obtain optimal particle size. Copper smelting slags in the Bardeskan district, with work index of 16.24 kwh/st, were grinded for 65 minutes to reach an acceptable degree of freedom for the flotation tests, with particle size of 80%, smaller than 70 μm. With this gri...

متن کامل

Dynamic Relationship between Inflation Uncertainty and Private Investment in Iran: An Application of VAR-GARCH-M Model

This paper empirically investigates the relationship between CPI inflation uncertainty, and private investment in the Iranian economy from 1988 to 2010 by using quarterly data. We employ a bivariate VAR(5)-GARCH(1,1)-in-mean with diagonal BEKK model to discover in a unified framework how are the interactions between the variables. In the model, conditional variance of inflation and private inve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017