Uncertainty of Net Present Value calculations and the impact on applying integrated maintenance approaches to the UK rail industry

نویسندگان

  • L. Kirkwood
  • E. Shehab
  • P. Baguley
  • A. Starr
چکیده

The Public performance indicator (PPI) is an important Key Performance Indicator for Network Rail and monitored carefully by the organisation and their external stakeholders. Condition monitoring is of increasing interest within network rail as a suitable method for increasing asset reliability and improving the PPI metric. As condition monitoring methods are identified each will need assessment to establish the cost and benefit. Benefit can be measured in cost savings as poor PPI performance results in fines. Within many industries Net Present Value (NPV) calculations are used to determine how quickly investments will break-even. Cost-risk is a term that is used to describe the financial impact of an unexpected event (a risk). This paper outlines a more detailed approach to calculating NPV which considers the cost-risk effect of changes of the denial of service charging rate. NPV prediction is of importance when assessing when to deploy different fault detection strategies to maintenance issues, and therefore the cost-risk of the NPV calculation should be used to support asset management decisions. © 2015 The Authors. Published by Elsevier B.V. Peer-review under responsibility of the Programme Chair of the Fourth International Conference on Through-life Engineering Services.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

 The Quantification of Uncertainties in Production Prediction Using Integrated Statistical and Neural Network Approaches: An Iranian Gas Field Case Study

Uncertainty in production prediction has been subject to numerous investigations. Geological and reservoir engineering data comprise a huge number of data entries to the simulation models. Thus, uncertainty of these data can largely affect the reliability of the simulation model. Due to these reasons, it is worthy to present the desired quantity with a probability distribution instead of a sing...

متن کامل

Robust production scheduling in open-pit mining under uncertainty: a box counterpart approach

Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...

متن کامل

Integrated Well Placement and Completion Optimization using Heuristic Algorithms: A Case Study of an Iranian Carbonate Formation

Determination of optimum location for drilling a new well not only requires engineering judgments but also consumes excessive computational time. Additionally, availability of many physical constraints such as the well length, trajectory, and completion type and the numerous affecting parameters including, well type, well numbers, well-control variables prompt that the optimization approaches b...

متن کامل

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

Modified-Decoupled Net Present Value: The Intersection of Valuation and Time scaling of Risk in Energy Sector

Although the practical importance of investment analysis in long-term energy investments is well understood, choosing the proper method has always been a dilemma. In this regard, classic evaluation methods, with a history of almost a century, are mostly favored, but using them in the valuation of long-lasting energy projects has particular shortcomings, nevertheless. The drawbacks mainly stem f...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015