Assessment of dose rate profiles and accessibility inside the building of the experimental fusion reactor, ITER, during operation and after shutdown
نویسندگان
چکیده
During the D–T operation of the International Thermonuclear Experimental Reactor (ITER), the dose inside ITER building is attributed to neutrons and gamma-rays streaming from various openings in the machine, whereas after shutdown, it is solely due to the decay gammas from activated components inside the building. In the present study, two cases of different geometrical arrangement are considered (Case A and Case C) in which the impact of the size of the opening of the NBI horizontal ports and presence of the NBI structure on the dose profiles everywhere in ITER building was studied and compared to the case (Case B) where all the horizontal ports are plugged. Contours and mapping of the dose rate profiles during operation, at shutdown, and at one-day, one-week, and one-month after shutdown, were generated for the three cases. Zone classification requirements for each hall/room and gallery of the building in terms of the maximum allowed exposure dose during operation and after shutdown were examined to identify where these requirements are met during ‘hands-on’ maintenance activities. It is shown that the requirements are satisfied at all times after shutdown in the halls above the ground, even during operation. For the conservative Case A, the dose rates are excessively high inside the equatorial NBI hall and inside the access halls above and below (divertor hall). In Case C, all the halls/vaults and galleries are accessible 1-week after shutdown, except inside the NBI hall whose dose rate (6.2×10 mSv h) exceeds the required zone classification (3–10 mSv h). All areas are accessible a week after shutdown in Case B which represents the building side away from the NBI ports. However, in all these cases, the accessibility criterion inside the rooms beneath the cryostat is not met at all times after shutdown due to the rather thin bottom bioshield (50 cm) which may necessitate some design changes. © 1998 Elsevier Science S.A. All rights reserved.
منابع مشابه
ارتقای ایمنی راکتور تحقیقاتی تهران با سیستم خاموشی دوم: مطالعه موردی انتشار آلاینده-های پرتوزای ناشی از وقوع حادثه ذوب قلب
Tehran Research Reactor (TRR) is in a residential area. Some other characteristics such as aged, relatively full time operation and also being the only available reactor for producing some radioisotopes, are the reasons for special attention to this reactor safety. Recently, a Second Shutdown System (SSS) has been designed for this reactor, which is completely independent and diverse from First...
متن کاملUWFDM-890 Environmental and Safety Aspects of ``OSIRIS'': A Heavy Ion Beam Driven IFE Reactor
A detailed safety analysis was performed for the inertial confinement fusion reactor OSIRIS. The radioactivity induced in the carbon fabric chamber concrete shield and Flibe breeder is very low allowing for their disposal at the end of the reactor life as Class A low level waste (LLW). The biological dose rate after shutdown behind the reactor biological shield shield is very low (0.11 μ rem/hr...
متن کاملUWFDM-1023 Environmental and Safety Assessment of LIBRA-SP: A Light Ion Fusion Power Reactor Design
LIBRA-SP is a 1000 MWe light ion beam power reactor design study. The reactor structure is made of a low activation ferritic steel and uses LiPb as a breeder. The total activities in the blanket and reflector at shutdown are 721 MCi and 924 MCi, respectively. Hands-on maintenance is impossible anywhere inside the reactor chamber. The biological dose rates near the diode are too high at all time...
متن کاملPhysics of plasma control towards steady-state operation of ITER
ITER is a fusion experimental reactor to show scientific and technological feasibility of fusion energy. It is designed to produce fusion power of 500MW for 300-500 seconds with fusion energy gain Q at least 10 (Q ≥10) [1], [2]. ITER should show scientific and technological feasibility of fusion energy as one step to DEMO, which produces electricity by fusion energy. Although design of DEMO wil...
متن کاملUWFDM-988 Activation Analysis of the PULSAR-I Fusion Power Reactor
PULSAR-I is a 1000 MWe pulsed inductively-driven tokamak design. The reactor uses a helium-cooled SiC composite as a structural material and Li2O as a breeder. At shutdown, the blanket and shield activities are 693 and 77.9 MCi, respectively. The blanket activity drops by more than two orders of magnitude during the first hour following its replacement. The shield activity drops more slowly tha...
متن کامل