Improvement in laboratory test turnaround times for inpatients following move to hub and spoke model of delivery

نویسندگان

  • David James
  • Derek Truman
چکیده

OBJECTIVES The relative merits of hub and spoke models of service delivery are often debated, but accessing data on how they may benefit service delivery can be difficult, and may hinder the adoption of a model which can benefit the health community. Our aim was to provide objective data that would either support or refute one potential benefit of service redesign, namely the effect on turnaround times within the acute hospital. DESIGN AND METHODS Data on turnaround times for sequential requests containing creatinine as a request item received from inpatient locations at two acute hospitals were extracted from the laboratory computer system. Monthly data was collected for a period of 5 months prior to and the same 5 month period following the service redesign. Data was subjected to statistical process control (SPC) analysis. RESULTS There was a statistically significant reduction (P<0.05) in the average turnaround time of at least 29% for routine requests and 22% for urgent requests, accompanied by a statistically significant reduction (P<0.05) in upper control limits of least 46% - improving the predictability of result availability and reducing the 95% confidence interval for turnaround times. CONCLUSIONS Adoption of a "hub and spoke" model has the potential to support laboratories in improving both urgent and non-urgent turnaround times in a cost-efficient manner within acute hospitals, and reduce the variability in turnaround time.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lean six sigma process improvement in specimen receiving to improve stat chemistry turnaround times

  Objective: As a consequence of stat turnaround times (TATs) chronically exceeding 60 minutes, our laboratory was facing pressure to divert limited resources toward the implementation of an emergency department satellite laboratory. Peer-reviewed literature in clinical laboratory quality assurance and improvement indicates that between 60-70% of errors occur at the pre-analytical level.  Thus...

متن کامل

Reliable hub-and-spoke network design problems under uncertainty through multi-objective programming

HLP (hub location problem) tries to find locations of hub facilities and assignment of nodes to extended facilities. Hubs are facilities to collect, arrange, and distribute commodities in telecommunication networks, cargo delivery systems, etc. Hubs are very crucial and their inaccessibility impresses on network whole levels. In this paper, first, total reliability of the network is defined bas...

متن کامل

A Multi-Level Capacity Approach to the Hub and Spoke Network

The existing works considering the flow-based discount factor in the hub and spoke problems, assume that increasing the amount of flow passing through each edge of network continuously decreases the unit flow transportation cost. Although a higher volume of flow allows for using wider links and consequently cheaper transportation, but the unit of flow enjoys more discounts, quite like replacing...

متن کامل

A Hybrid Solution Method for Hub-and-Spoke Network Design under Uncertainty

Supply chain is an integrated system of facilities and activities. Gaining the optimum design of demand satisfaction network is one of the most important live issues in the decision making problems category. Most of previous studies considered unreal assumptions such as the lack of capacity constraints to satisfy demand in the network and in hubs. By considering the nature of the case that have...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 1  شماره 

صفحات  -

تاریخ انتشار 2015