Assembly Process

نویسندگان

  • A. Ananthanarayanan
  • C. Thamire
چکیده

Revolute joints are frequently used in articulated structures. Traditionally, such a joint is formed by assembling two components. As an alternative, revolute joints can be created inside the mold using an in-mold assembly process. This process eliminates the need for post-molding assembly, thus significantly reducing the cycle time and part count. The functional performance of a revolute joint depends on the clearance in the joint. The clearance in turn depends on the part shrinkage and the mold deformation during the molding process. The presence of a polymer part during the second molding stage makes an inmold assembly process significantly different from the traditional molding process due to the difference in heat transfer and deformation characteristics. This paper presents experimental data and a preliminary model to explain the differences in clearance produced by an Aluminum mold and an Aluminum mold with an Acrylonitrile butadiene styrene (ABS) insert. Our data indicates that there is a significant difference between the clearances observed from these two different types of molds. We believe that clearances produced depend strongly on the thermal history of the parts.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Process Capability Studies in an Automated Flexible Assembly Process: A Case Study in an Automotive Industry

Statistical Process Control (SPC) methods can significantly increase organizational efficiency if appropriately used. The primary goal of process capability studies is to obtain critical information about processes to render them even more effective. This paper proposes a comprehensive framework for proper implementation of SPC studies, including the design of the sampling procedure and interva...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

Online Distribution and Load Balancing Optimization Using the Robin Hood and Johnson Hybrid Algorithm

Proper planning of assembly lines is one of the production managers’ concerns at the tactical level so that it would be possible to use the machine capacity, reduce operating costs and deliver customer orders on time. The lack of an efficient method in balancing assembly line can create threatening problems for manufacturing organizations. The use of assembly line balancing methods cannot balan...

متن کامل

Designing a model of requirements for fulfilling the oversight role of the Islamic Consultative Assembly on the annual budget of the country

Considering the high and important role of the Islamic Consultative Assembly in the process of approving the budget of the whole country and monitoring its implementation, the purpose of this study is to design and explain the pattern of requirements for the oversight role of the Assembly in the annual budget. In terms of research purpose, the present study is an exploratory research. Also, the...

متن کامل

تأثیر طراحی خطوط مونتاژ بر اساس تکنیک‌های مهندسی بر بهره‌وری و فاکتورهای ارگونومی

Background and aims: In manual assembly industries, productivity could increase by scientific study, correct and accurate identification of activities and the time required for implementing each activity - with respect to the health, safety and human wellbeing. Although the positive effect of engineering interventions on the efficiency of production is evident, but its impact on the productivit...

متن کامل

Reduction of production disturbances of a shoemaking industry through a discrete event simulation approach

This study presents a reduction of production disturbances of a shoemaking industry through discrete event simulation approach. The study is conducted at Peacock Shoe factory found in Addis Ababa, Ethiopia.  This factory faces line balancing problem that becomes production disturbance for its assembly lines. Detail time study is carried out for the selected shoe model using stopwatch. Assembly ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007