Seventh Framework Programme Dissemination Level of Deliverable Pu (public)

نویسندگان

  • Salvatore Spadaro
  • David Larrabeiti
چکیده

This deliverables reports the joint activities planned within the WP22. Keyword list: MPLS, GMPLS, BGP, Control Plane FP7-ICT-216863/UC3M-UPC/R/PU/D22.1 Page 2 of 9 Disclaimer The information, documentation and figures available in this deliverable, is written by the BONE (“Building the Future Optical Network in Europe) – project consortium under EC co-financing contract FP7-ICT-216863 and does not necessarily reflect the views of the European Commission FP7-ICT-216863/UC3M-UPC/R/PU/D22.1 Page 3 of 9 Table of

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Seventh Framework Programme Ict Priority Deliverable D9.3: " Second Year Demonstrators and Evaluation Report "

Project co-funded by the European Commission within the 7 th Framework Programme Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

متن کامل

Seventh Framework Programme Ict Priority Deliverable D3.7: " Neural Coding of Objects and Attention Control " Project Co-funded by the European Commission within the 7 Th Framework Programme

Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

متن کامل

Seventh Framework Programme Ict Priority Deliverable D3.3: " Dense Multi-view Stereo " Project Co-funded by the European Commission within the 7 Th Framework Programme

Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

متن کامل

Seventh Framework Programme Ict Priority Deliverable D8.1: " Report on Interfaces to Relevant Engineering Systems and Standards " Project Co-funded by the European Commission within the 7 Th Framework Programme

Dissemination Level PU Public X PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services)

متن کامل

Seventh Framework Programme Title of Deliverable: D22.2: Report on Y1 and Updated Plan for Activities Dissemination Level of Deliverable Pu

This deliverable describes the activity carried out during the first year of WP22. This work has been structured into Joint Activities (JA) by complementary partners. Keyword list: MPLS, GMPLS, routing, optical networks, IP, electronic-optical convergence, BGP, PCE, path computation, protection, signaling FP7-ICT-216863/ UC3M-UPC/O/PU/D22.2 Page 2 of 56 Clarification: Nature of the Deliverable ...

متن کامل

Table of Revisions

Project co-funded by the European Commission within the Seventh Framework Programme (2010-2012) Dissemination Level PU Public PP Restricted to other programme participants (including the Commission Services) RE Restricted to a group specified by the consortium (including the Commission Services) CO Confidential, only for members of the consortium (including the Commission Services) This documen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008