Rolling Stock Rostering Optimization Under Maintenance Constraints

نویسندگان

  • Giovanni Luca Giacco
  • Andrea D'Ariano
  • Dario Pacciarelli
چکیده

This paper presents an integer programming formulation for integrating maintenance planning tasks in the railway rolling stock circulation problem. This is a key problem in railway rostering planning that requires to cover a given set of services and maintenance works with a minimum amount of rolling stock units. An additional objective is to limit the number of empty rides. The constraints of the rolling stock rostering problem require that different types of maintenance operations must be carried out for each train periodically. The various maintenance tasks can only be done at a limited number of dedicated sites. This is achieved by a graph theoretical approach that combines the scheduling tasks related to train services, maintenance operations and empty rides. Preliminary computational results on real-world scenarios show that this integrated approach can reduce significantly the number of trains and empty rides when compared with the current rolling stock circulation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A heuristic algorithm for the circulation plan of railway electrical motor units

The rolling stock rostering problem with maintenance constraints is NP-hard. In this paper, a two-stage approach is proposed. Relaxing the maintenance constraints, a transition network with minimum train unit is established in the first stage. A heuristic algorithm based on the transitions interchange is devised to search for a feasible maintenance route. The algorithm is verified with the oper...

متن کامل

Strategic Planning for the National Bridge Stock of Iran

The National Bridge Stock of Iran consists of about 330,000 bridges, of which around 50% are older than 30 years. Since 2010, Iran Road Maintenance & Transportation Organization has started implementing a comprehensive Bridge Management System in order to manage this aged stock efficiently. To predict future conditions of bridge stock, a heuristic numerical method is presented. This methodology...

متن کامل

Integrated Optimization of Rolling Stock Rotations for Intercity Railways

This paper provides a highly integrated solution approach for rolling stock planning problems in the context of intercity passenger traffic. The main contributions are a generic hypergraph based mixed integer programming model and an integrated algorithm for the considered rolling stock rotation planning problem. The new developed approach is able to handle a very large set of industrial railwa...

متن کامل

Re-Optimization of Rolling Stock Rotations

The Rolling Stock Rotation Problem is to schedule rail vehicles in order to cover timetabled trips by a cost optimal set of vehicle rotations. The problem integrates several facets of railway optimization, i.e., vehicle composition, maintenance constraints, and regularity aspects. In industrial applications existing schedules often have to be re-optimized to integrate timetable changes or const...

متن کامل

Application of Remote Condition Monitoring in Different Rolling Stock Life Cycle Phases

NedTrain is the Netherlands Railway’s subsidiary responsible for rolling stock maintenance. The life cycle is 30-40 years where the asset condition is maintained to meet it’s performance requirements and is enhanced to meet the customer expectations through it’s life. The life cycle costs are roughly 1/3 for the new build investment and 2/3 for subsequent maintenance and further investments. Cu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Intellig. Transport. Systems

دوره 18  شماره 

صفحات  -

تاریخ انتشار 2014