Risk Assessment of Oil and Gas Drilling Engineering Cooperation Project Based on Fuzzy Comprehensive Evaluation
نویسندگان
چکیده
Abstract This paper establishes the risk assessment index system according to characteristics of oil and gas drilling engineering cooperation project. After modularizing risk indexes of oil and gas drilling engineering cooperation project into eight clusters, risks are evaluated on the basis of multi-level fuzzy comprehensive evaluation method. The study is to construct risk assessment indexes system of oil and gas drilling in order to provide a guide to establishment of risk prevention mechanism, and to provide significant reference for decision-makers of oil & gas drilling engineering cooperation project.
منابع مشابه
Risk Assessment of Investments with Fuzzy Efficiency Indicators for Oil and Gas Production Industry
In the process of investment decision making, next to financial indicators many other aspects of investment projects are increasingly often considered. This leads to the multi-criteria evaluation of a project. The advantage of multi-criteria methods is the ability to take into account all (not only financial) aspects of the attractiveness of an investment project. The selection of criteria of p...
متن کاملIdentification and ranking risks of horizontal directional drilling for oil & gas wells by using fuzzy analytic network process, a case study for Gachsaran oil field wells
Risk ranking of Horizontal Directional Drilling (HDD) for gas and oil wells is a key criterion in the project feasibility, pricing and for introducing a risk management strategy that aims to reduce the number of failures in the installation phase and its negative consequences. HDD is currently widely used in drilling wells in Iran, but research in the area of identification and risks ranking of...
متن کاملAn Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment
Effective project management requires reliable knowledge of cash required in different stages of project life cycle. Getting this knowledge is highly dependent on sophisticated consideration of project environment. Nature of projects and their environments are associated with uncertain conditions. In this paper, a new project cash flow assessment method based on project scheduling is proposed t...
متن کاملA Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses
The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...
متن کاملComprehensive Evaluation of Drilling Risk Based on Unascertained Measurement
Drilling engineering is not only a systematic engineering that involves several workcategories, work procedures,intersectant and continuous operation, but also is a concealed underground engineering. There are uncertain factors in drilling projects, which have the characteristics of high investment and risk. On the basis of the overall analysis of the two factors of geology and engineering, the...
متن کامل