Optimal Ordering of Activities of New Product Development Projects with Time and Cost Considerations

نویسندگان

  • Hisham M. Abdelsalam
  • Amany Magdy
چکیده

This chapter presents a Discrete Multi-objective Particle Swarm Optimization (MOPSO) algorithm that determines the optimal order of activities execution within a design project that minimizes project total iterative time and cost. Numerical Design Structure Matrix (DSM) was used to model project activities’ execution order along with their interactions providing a base for calculating the objective functions. Algorithm performance was tested on a hypothetical project data and results showed its ability to reach Pareto fronts on different sets of objective functions. DOI: 10.4018/978-1-4666-2086-5.ch018

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Simulation-Based Optimization Model for Scheduling New Product Development Projects in Research and Development Centers

a simulation-based optimization approach for the purpose of finding a near-optimal answer can be efficient and effective. In the present paper, first, the mathematical model for the project activity scheduling problem has been presented with a job shop approach. Then, using the Arena 14 software, the simulation model has been designed. Consequently, a numerical example has been solved via runni...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

A mathematical model for balancing (cost-time-quality and environmental risks) in oil and gas projects and solving it by multi-objective Bee Colony Algorithm

Today, in large projects such as constructing oil, gas and petrochemical refineries, it is inevitable to use modern management methods and project timing. On the other hand, in classic scheduling case, the focus is on balance between time and cost of carrying out projects, which in such a situation, one of possible solutions to shorten time of implementing project is to accelerate activities. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016