An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost
نویسنده
چکیده
The single-vendor single-buyer integrated production inventory system has been an object of study for a long time, but little is known about the effect of investing in reducing ordering cost on the integrated inventory models with backorder price discount and variable lead time. The purpose of this article is to investigate in the continuous review model with backorder price discount and variable lead time to effectively increase investment and to reduce the joint expected annual total cost. The integrated strategy discussed here is one in which the buyer orders a quantity, then the vendor produces n times order quantity in each production cycle, in order to reduce setup cost. In addition, the buyer offers backorder price discounts to the customers that may motivate the customers’ desire for backorders, and buyer ordering cost can be reduced through effective investment. An integrated inventory model is established to find the optimal solutions of order quantity, ordering cost, backorder price discount, lead time, and the number of shipments from the vendor to the buyer in one production run, so that the joint expected annual total cost incurred has the minimum value. Furthermore, numerical examples are used to demonstrate the benefits of the model. 2008 Elsevier Ltd. All rights reserved.
منابع مشابه
Trade credit financing in the vendor – buyer inventory system with ordering cost reduction , transportation cost and backorder price discount when the received quantity is uncertain
Previous ordering cost reduction vendor–buyer inventory models with backorder price discount usually assumed that the buyer must pay to the vendor for the ordered items as soon as the items are received, the received quantity is same as the ordered quantity and the transportation cost is independent of the shipment lot-size. In practice, however, the vendor is willing to offer the buyer a certa...
متن کاملA single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time
Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...
متن کاملIntegrated Inventory Model with Controllable Lead Time Involving Investment for Quality Improvement in Supply Chain System
The purpose of this article is to investigate a two-echelon supply chain inventory problem consisting of a single-vendor and a single-buyer with controllable lead time and investment for quality improvements. This paper presents an integrated vendor-buyer inventory model in order to minimize the sum of the ordering cost, holding cost, setup cost, investment for quality improvement and crashing ...
متن کاملAn Integrated Production-Inventory Model with Backorder and Lot for Lot Policy
inventory model, backorder buyer , vendor, lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...
متن کاملModeling and Analyzing Incremental Quantity Discounts in Transportation Costs for a Joint Economic Lot Sizing Problem
Joint economic lot sizing (JELS) addresses integrated inventory models in a supply chain. Most of the studies in this field either do not consider the role of the transportation cost in their analysis or consider transportation cost as a fixed part of the ordering costs. In this article, a model is developed to analyze an incremental quantity discount in transportation cost. Appropriate equatio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 56 شماره
صفحات -
تاریخ انتشار 2009