The Critical Path Problem in Timing Veri
نویسنده
چکیده
This paper is an introduction to the problem of Critical Path determination in the context of Timing Veriication. After correct logic veriication, timing is the next most important concern to be addressed by designers. The speed of a circuit is related to the length of the longest path through which a signal can travel, also known as the longest true path or critical path of the circuit. This paper will focus on the oating mode of operation and will address two main problems, namely the sensitization conditions for a path to be true and the methods that lead to eecient computation of the true delay of a circuit. Included are descriptions of various sensitization conditions in use, explaining its strengths and shortcomings. The relation between these conditions is also established. Finally a method that eeciently computes the circuit delay is presented. A summary of three very relevant papers on the subject is included and several other references are also discussed. Since these three papers are not comprehensive of the eld, we chose to pursue an historic view of the single-vector condition and then explain the contribution of each of the papers.
منابع مشابه
Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...
متن کاملSolving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets
Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملAn Efficient Method for Selecting a Reliable Path under Uncertainty Conditions
In a network that has the potential to block some paths, choosing a reliable path, so that its survival probability is high, is an important and practical issue. The importance of this issue is very considerable in critical situations such as natural disasters, floods and earthquakes. In the case of the reliable path, survival or blocking of each arc on a network in critical situations is an un...
متن کاملA new heuristic method based on CPM in SALBP
The task of balancing of assembly lines is well-known in mass production system but this problem is NP-hard even for the simple straight line. Therefore, utilizing heuristic methods for these problems is totally unquestionable. Furthermore, in line with balancing problems, heuristic methods are the foundation of the metaheuristic methods, thus it seems to be necessary to use more efficient heur...
متن کامل