Design of a Naval Tender Job Shop
ثبت نشده
چکیده
منابع مشابه
Optimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملA Comparison of Job-Shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own pros and cons, each of which is suitable to a specific kind of factory. ...
متن کاملA Comparison of Job-shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...
متن کاملOptimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملA Comparison of Job-shop and Group Technology Using Simulation by ARENA
Production planning is performed through diverse methods according to the type of the system it is structured upon. One of the most important steps before production planning is to determine which system best fits the firm, and how the facilities should be designed. Both job-shop and group-technology systems have their own cons and pros, each of which is suitable to a specific kind of factory. ...
متن کامل