Resource-constrained project scheduling problem with uncertain durations and renewable resources
نویسندگان
چکیده
Resource-constrained project scheduling problem is to make a schedule for minimization of the makespan subject to precedence and resource constraints. In this paper, we consider an uncertain resource constrained project scheduling problem (URCPSP) with renewable resource constraints, in which activity durations, with no historical data generally, are estimated by belief degrees. For purpose of managing these estimations in URCPSP, an uncertainty-theory-based project scheduling model is proposed. Furthermore, a genetic algorithm integrating a 99-method based uncertain simulation is designed to search the quasi-optimal schedule. Numerical examples are also provided to illustrate the effectiveness of the model and the algorithm.
منابع مشابه
A UNIFIED MODEL FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH UNCERTAIN ACTIVITY DURATIONS
In this paper we present a unified (probabilistic/possibilistic) model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations and a concept of a heuristic approach connected to the theoretical model. It is shown that the uncertainty management can be built into any heuristic algorithm developed to solve RCPSP with deterministic activity durations. The esse...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC
In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Int. J. Machine Learning & Cybernetics
دوره 7 شماره
صفحات -
تاریخ انتشار 2016