Cluckie (1990) states that "when a site has about 40 or 50 years of record it is unlikely to contribute significantly to the improvement of a regionally based statistical estimate by the availability of more data". In the present paper, the authors conclude that "databases with more than 300 station-years can be considered in a quite good condition in terms of quantity of information and that, consequently, the addition of more records may not materially affect the outcome of any future analysis". Coupled with the encouragement given to downweight or exclude "outliers", there would seem to be an inference that there is sometimes an overabundance of information for flood frequency estimation. While this may be true in lesser contexts, the conclusion seems misplaced in a paper which discusses dam safety procedures. The authors' use of a pooling system based on distance from the subject site has similarities with that put forward for rainfall frequency estimation by Reed & Stewart (1989) but does not make any explicit allowance for interdependence in the gauged annual maxima. Both Schaefer (1990) and Buishand (1990) appear to accept Hosking & Wallis's conclusion that intersite dependence adds uncertainty but no bias to regional flood estimates (Hosking & Wallis, 1988). The example which follows demonstrates that the GEV-PWM regional procedure can be highly sensitive to the occurrence of a widespread extreme event. In these circumstances it appears advisable for a regional flood frequency analysis to exploit all the available information, and to make some allowance for inter-site dependence. This finding does not sit comfortably with the conclusions of Cluckie & Pessoa (1990) and Hosking & Wallis (1988).

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dam safety: an evaluation of some procedures for design flood estimation*

This paper analyses a number of aspects related to the estimation of the design flood for a dam. A new approach to the estimation of the probable maximum precipitation (PMP) is described which takes advantage of the spatial variability of precipitation by using radar-derived distributed rainfall measurements. Procedures which utilize storm transposition and storm maximization are introduced to ...

متن کامل

Analysis of Recorded Rainfall Information for the Purpose of Huff Curves Extraction in the Dez Dam

Identifying the rainfall characteristics and understanding the rainfall-related processes is one of the key factors in the scientific management of water resources. Selection of the design storm is the first step in the estimation of the design flood. Determining temporal rainfall patterns is very important as one of the design rainfall properties in flood estimation and the design of drainage ...

متن کامل

ارزیابی و مقایسه تعدادی از روش‌های تحلیل کمی ریسک در برآورد سیلاب طراحی سرریز سدها (مطالعه موردی : سد پیشین)

Overtopping is one of the main factors responsible for dam failure. To avoid overtopping, dam is equipped with one or some spillways to release the water impounded in the reservoir. The number and size of these spillways are determined on the basis of design flood. Determination of design flood of dam spillway can be formulated as a multiobjective risk problem. This problem can be solved by Qua...

متن کامل

ارزیابی و مقایسه تعدادی از روش‌های تحلیل کمی ریسک در برآورد سیلاب طراحی سرریز سدها (مطالعه موردی : سد پیشین)

Overtopping is one of the main factors responsible for dam failure. To avoid overtopping, dam is equipped with one or some spillways to release the water impounded in the reservoir. The number and size of these spillways are determined on the basis of design flood. Determination of design flood of dam spillway can be formulated as a multiobjective risk problem. This problem can be solved by Qua...

متن کامل

Determination of the Height and Overtopping failure of Reservoir Dams by Using Reliability Analysis (Case Study: Namrood Dam)

Generally, the design of dams and other hydraulic structures is carried out based on deterministic approaches. However, there are many uncertainties in the estimation of different effective parameters in hydraulic structures design. The inherent uncertainties in these parameters necessitate reliability analysis to ensure the structure stability. In this study, after investigating various uncert...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007