Parallel branch-and-bound methods for thejob-shop scheduling problem
نویسندگان
چکیده
Job-Shop Scheduling (JSS) problems are among the more difficult to solve in the class of N P -complete problems. The only successful approach has been Branch-and-Bound based algorithms, but such algorithms depend heavily on good bound functions. Much work has been done to identify such functions for the JSS problem, but with limited success. Even with recent methods, it is still not possible to solve problems substantially larger than 10 machines and 10 jobs. In the current study we focus on parallel methods for solving JSS problems. We implement two different parallel Branch-and-Bound algorithms for JSS on a 16-processor MEIKO Computing Surface with Intel i860 processors and perform extensive computational testing using classical publicly available benchmark problems. The parallel part of one of the implementations is based on a similar parallel code for Quadratic Assignment Problems. Results are reported for different branching rules proposed in the literature.
منابع مشابه
Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...
متن کاملA modified branch and bound algorithm for a vague flow-shop scheduling problem
Uncertainty plays a significant role in modeling and optimization of real world systems. Among uncertain approaches, fuzziness describes impreciseness while for ambiguity another definition is required. Vagueness is a probabilistic model of uncertainty being helpful to include ambiguity into modeling different processes especially in industrial systems. In this paper, a vague set based on dista...
متن کاملA New Lower Bound for Flexible Flow Shop Problem with Unrelated Parallel Machines
Flexible flow shop scheduling problem (FFS) with unrelated parallel machines contains sequencing in flow shop where, at any stage, there exists one or more processors. The objective consists of minimizing the maximum completion time. Because of NP-completeness of FFS problem, it is necessary to use heuristics method to address problems of moderate to large scale problem. Therefore, for assessme...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Annals OR
دوره 83 شماره
صفحات -
تاریخ انتشار 1998