Study on Linear Vibration Model of Shield TBM Cutterhead Driving System
نویسندگان
چکیده
In this paper, a general linear time-varying multiple-axis (LTVMA) vibration model of shield tunnel boring machine (TBM) cutterhead driving system is established. The corresponding multiple inputs and multiple outputs (MIMO) state-space model is also presented. The linear vibration model is analysed, and the vibration-torque transfer function matrix and the vibration-torque static gain matrix are obtained. The linear vibration model is simulated, and the physical parameters’ effects on the vibration response are investigated. A preliminary approach is proposed to reduce vibration by increasing motor rotor inertia and viscous damped. The LTVMA vibration model provides a solid foundation for fault detection and diagnosis (FDD), as long as the health monitoring of cutterhead driving system.
منابع مشابه
Influence of Geological Conditions on Measured TBM Vibration Frequency
This paper examines TBM vibration as a source of information about geological conditions. An EPB TBM was outfitted with accelerometers to monitor vibration during excavation of the University Link light rail tunnel project (U230) in Seattle Washington. Impact-response testing of the TBM indicated that significant signal over a wide range of frequencies transfers from the cutterhead where vibrat...
متن کاملHeat Conduction Model of TBM Disc Cutter Cutting Temperature and Its Solution
Disc cutter is Full face rock tunnel boring machine (TBM) important rock breaking tool, cutting heat generation has an important influence on cutter life, disc cutter cutting temperature characteristic research be imperative. Based on heat conduction theory to establish disc cutter cutting temperature heat conduction model, and derive its solution; analyze influence on disc cutter cutting tempe...
متن کاملIntroducing hard rock TBMs’ downtime analysis model with reference to past case histories’ data
The study of downtime and subsequently machine utilization in a given project is one of the major requirements of an accurate estimation of TBM performance and daily advance rate. Interestingly, while it is very common to report the components of downtime when discussing a tunneling project in the literature; there has not been a great amount of in-depth studies on this topic in the recent year...
متن کاملCutterhead and Cutting Tools Configurations in Coarse Grain Soils
Received: November 30, 2016 Revised: February 13, 2017 Accepted: February 13, 2017 Abstract: Background: Many subway/metro tunnels were constructed using close face shield machines in coarse grain soils in last decades. Configurations of the shield cutterhead and cutting tools are critical in terms of cost and project duration. There are currently no recognized methodologies available for the c...
متن کاملADAPTIVE NEURO FUZZY INFERENCE SYSTEM BASED ON FUZZY C–MEANS CLUSTERING ALGORITHM, A TECHNIQUE FOR ESTIMATION OF TBM PENETRATION RATE
The tunnel boring machine (TBM) penetration rate estimation is one of the crucial and complex tasks encountered frequently to excavate the mechanical tunnels. Estimating the machine penetration rate may reduce the risks related to high capital costs typical for excavation operation. Thus establishing a relationship between rock properties and TBM pe...