Calculating the Project Network Critical Path in Uncertainty Conditions

نویسندگان

  • N. Shahsavari
  • M. Modarres
  • R. Tavakoli Moghadam
چکیده

Correct scheduling of the project is the necessary condition for the project success. In traditional models, the activities duration times are deterministic and known. In real world however, accurate calculation of time for performing each activity is not possible and is always faced with uncertainty. In this paper, the duration of each activity is estimated by the experts as linguistic variables and the said variables are represented in fuzzy numbers form using the fuzzy theory. Estimating the project accomplishment duration and determining the project critical path will be possible through resolving a fuzzy linear programming model. For solving model, Fuzzy Critical Path Method Algorithm (FCPMA) is introduced that uses fuzzy numbers ranking. In none of this method steps the defuzzification of the fuzzy numbers occurs, and the project accomplishment duration is gained in trapezoidal fuzzy number. Finally the performance of the introduced algorithm is shown using an application example.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

An Efficient Method for Selecting a Reliable Path under Uncertainty Conditions

In a network that has the potential to block some paths, choosing a reliable path, so that its survival probability is high, is an important and practical issue. The importance of this issue is very considerable in critical situations such as natural disasters, floods and earthquakes. In the case of the reliable path, survival or blocking of each arc on a network in critical situations is an un...

متن کامل

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

Fuzzy Critical Path Method Based on Lexicographic Ordering of Fuzzy Numbers

The Critical Path Method (CPM) is useful for planning and control of complex projects. The CPM identifies the critical activities in the critical path of an activity network. The successful implementation of CPM requires the availability of clear determined time duration for each activity. However, in practical situations this requirement is usually hard to fulfill since many of activities will...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010