P. Bellomo, A. de Lira (SLAC) Menlo Park, CA 94025-7015, USA Abstract The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003 and 100mA operation was reached on January 20, 2004. This paper describes the specification, design, and performance of the SPEAR3 DC magnet intermediate power supplies (IPS) that consist of tightly-regulated (better than ±10ppm) current sources ranging from 60 A to 500 A and output powers ranging from 2.4kW to 22.5kW. A total of 69 IPS are in successful operation. The SPEAR 3 upgrade performance and reliability requirements mandated new power supplies for both the SPEAR3 storage ring, and for the booster-to-SPEAR3 transport line. IPS are widely used at SPEAR3 to power single quadrupoles, dipoles, families of quadrupoles and sextupoles, and also Titanium sublimation pumps. IPS topology allows them to be series operated for those magnet strings requiring higher voltages. A compact 19" standard rack-mounted design is common to all the units. These are off-line, switch-mode, operating at 16 kHz to reduce space and provide for fast output response and high efficiency.
منابع مشابه
Spear3 Large Dc Magnet Power Supplies
The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003 and 100mA operation was reached on January 20, 2004. This paper describes the specification, design, and performance of the SPEAR3 DC magnet large power supplies (LGPS) that consist of tightly-regulated (better...
متن کاملFast Global Orbit Feedback System in Spear3*
The new fast orbit feedback system (FOFB) is being commissioned at the SPEAR3 light source. The system has a 4kHz sampling rate and 100Hz bandwidth. The correction algorithm is based on the Singular Value Decomposition (SVD) of the orbit response matrix. For performance tuning and additional flexibility when adding or removing Corrector Magnets (CM) and Beam Position Monitors (BPMs), we impleme...
متن کاملDesign and Implementation of Cosine Control Firing Scheme for Single Phase Fully Controlled Bridge Rectifier
As per the industrial needs, regulated dc voltage with linear transfer characteristics is important in many applications such as dc magnet power supplies in a beam line system. To accomplish this motto, cosine control firing scheme is suggested to get the output voltage which is proportional to control voltage. Present paper deals with design and implementation of cosine control firing scheme f...
متن کاملPhotocathode Studies for the Spear3 Injector Rf Gun*
The electron gun for the SPEAR3 injector operates with a warm thermionic dispenser cathode immersed in a 1.5-cell RF structure. At each injection cycle the gun accelerates several thousand electron bunches up to ~3 MeV during a 2.5us rf pulse. The individual bunches are then compressed by an alpha magnet and a travellingwave chopper selects 3-5 bunches so they don’t cause beam loading to the li...
متن کاملProgress on PEP-II Magnet Power Conversion System
The various power systems for supplying the PEP-II DC magnets rely exclusively on switchmode conversion, utilizing a variety of means depending on the requirements. All of the larger power supplies, ranging from 10 to 200 kW, are powered from DC sources utilizing rectified 480 V AC. Choppers can be used for the series-connected strings, but for smaller groups and individual magnets, inverters d...