More on lot-to-lot changes.

نویسندگان

  • Renze Bais
  • Douglas Chesher
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Incorporating Return on Inventory Investment into Joint Lot-Sizing and Price Discriminating Decisions: A Fuzzy Chance Constraint Programming Model

Coordination of market decisions with other aspects of operations management such as production and inventory decisions has long been a meticulous research issue in supply chain management. Generally, changes to the original lot-sizing policy stimulated by market prices may impose remarkable deviation revenue throughout the supply and demand chain system. This paper examines how to set the chan...

متن کامل

An Integrated Production-Inventory Model with Backorder and Lot for Lot Policy

    inventory model,   backorder   buyer ,   vendor,   lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...

متن کامل

Prediction of kordan river geometric changes in the meandering Range

Predictions of total and even partial changes in rivers patterns are as the most essential issues related to rivers geomorphology. In this regarding, a lot of researches have been done by geomorphologists. This research has explored Kordan River aqueduct morphology changes in bights areas of Afkaneh cone surface. Kordan river is the one which has been affected by various factors and has changed...

متن کامل

Differences in Eating Habits, Stress, and Weight Changes among Indonesian Generations Y and Z Students during the COVID-19 Pandemic

Background: The Covid-19 Pandemic has had a lot of impacts on society and students from various generations. Generations are a group of people who have the same age, traits, and experiences. Not all generations can overcome the impact caused by the pandemic on themselves, which is the cause of various problems in each generation starting from habits, behaviors, and stress. Generations Z and Y a...

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Clinical chemistry

دوره 60 2  شماره 

صفحات  -

تاریخ انتشار 2014