Study on Lightning Intruding Overvoltage in Yantan Extension Substation

نویسندگان

  • Hongtao Zeng
  • Linlin Lin
  • Zhixin Wang
  • Wengang Tian
  • Cong Feng
  • Zhihuai Xiao
چکیده

500kV substation is especially important to the grid of our country, once it encounters lightning damage, the safety and reliability of the whole power system will be directly affected. As lightning intruding waves will cause overvoltage on electric equipments by intruding from the transmission line or straightly stroking the substation, which seriously influences the insulation level of equipments, so it is essential to calculate overvoltage on electric equipments when substation struck by lightning to ensure their safe operation under the protection of arrester. As for the new connection mode of extension project of Yantan 500kV substation, numerical model of hydropower equipments is established and electromagnetic transient simulation calculation software of ATP/EMTP is used for calculation of overvoltage on electric equipments. According to the result, conclusions about strong insulating of incoming line towers, importance of lightning shielding failure intruding waves and influence of power frequency voltage on lightning intruding overvoltage in 500 kV substation can be drawn. This is the first-time study on overvoltage in 500kV substation extension project and has certain practical guidance.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sensitivity Assessment of Lightning Protection Device Aging Effect on Distribution Substation Insulation

 Insufficient electrical endurance of equipment and insulation failure against overvoltage is one of the most effective reasons for failure the power line. Lightening, switching or other disruptive parameters can cause line outage or distribution substation failure. There are different devices used to improve the safety, reliability, and power quality of the system. Surge arresters are one of t...

متن کامل

Mitigation of Transient Overvoltages Generated Due to Switching Operations and Lightning in Gas-insulated Substation (GIS) Without Extra Limiter

Gas-insulated substations (GIS) have different specifications in proportion to air-insulated substations. Transformer failures related to lightning and switching are often reported in the gas insulated substation (GIS). This problem is the voltage magnifications due to reflections of switching and lightning surges at various junctions within the GIS. thereby overvoltages in GIS are more importa...

متن کامل

HV Substation Overvoltage Computation Taking into Account Frequency Dependent Transients on the Substation Grounding System

This paper describes methodology for the computation of the electromagnetic transients in the high voltage substations, taking into account transients on the substation grounding system. Simulation technology is based on the system decomposition. Interconnections between different subsystems are done in each time step using Thevenin equivalents. Frequency dependent impedance of grounding conduc...

متن کامل

Study on Very Fast Transient Overvoltage of Closing No-load China UHV Transmission Demonstration Project Jindongnan-Nanyang- Jingmen 1000 kV Transmission Lines

When the ultra high voltage (UHV) substation used the gas insulated switchgear (GIS) system to switch lines with capacitive current, the pre-breakdown and multiple reignition will occur between switching contacts. Because of discharge characteristics of SF6 and special structures of GIS system, the variations of the electromagnetic transient process and very fast transient overvoltage (VFTO) ar...

متن کامل

Back-flashover Investigation of HV Transmission Lines Using Transient Modeling of the Grounding Systems

The article presents the transients analysis of the substation grounding systems and transmission line tower footing resistances which can affect to the back-flashover (BF) or overvoltage across insulator chain in an HV power systems by using EMTP-RV software. The related transient modeling of the grounding systems is based on a transmission line (TL) model with considering the soil ionization....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014